My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2021 SEWER COMMISSION Minutes
>
06/17/2021 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 5:01:17 PM
Creation date
8/27/2021 12:38:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMENDMENT NO.4 <br /> TOWN OF MASH PEE AND <br /> GHD INC. <br /> PAGE 16 <br /> 2.02 Additional Services Not Requiring OWNER's Written Authorization <br /> A. ENGINEER shall advise OWNER that ENGINEER is commencing to perform or furnish the Additional <br /> Services of the types listed below. For such Additional Services, ENGINEER need not request or obtain <br /> specific advance written authorization from OWNER. ENGINEER shall cease performing or furnishing such <br /> Additional Services upon receipt of written notice to cease from OWNER. <br /> 1. Services in connection with Work Change Directives and Change Orders to reflect changes requested <br /> by OWNER. <br /> 2. Services in making revisions to Drawings and Specifications occasioned by the acceptance of substitute <br /> materials or equipment other than"or equal"items;services after the award of the Construction Contract <br /> in evaluating and determining the acceptability of a proposed "or equal" or substitution which is found <br /> to be inappropriate for the Project; evaluation and determination of an excessive number of proposed <br /> or equals"or substitutions,whether proposed before or after award of the Construction Contract. <br /> 3. Services resulting from significant delays, changes, or price increases occurring as a direct or indirect <br /> result of materials, equipment, or energy-shortages. <br /> 4. Additional or extended services arising from (a);the presence at the Site of any Constituent of Concern <br /> or items of historical or cultural,significance, (b)emergencies or acts of God endangering the Work, (c) <br /> damage to the Work by fire or other,causes during construction, (d) a significant amount of defective, <br /> neglected,or delayed Work,(e)acceleration of the progress schedule involving services beyond normal <br /> working hours,or(f)default by Contractor. ! ". <br /> 5. Services(other than Basic Services during the Post-Construction Phase)in connection with any partial <br /> utilization of the Work by OWNER prior to Substantial Cornpletioh. <br /> 6. Evaluating unreasonable o,r,frivolous requests for interpretation or information (RFIs), Change <br /> Proposals, or other demands'from Contractor;or others in connection with the Work, or an excessive <br /> number of RFIs Change Proposals;or demands, <br /> 7. R,eviewing a Shop,Drawmg,,or other Contractor submittal more than three times, as a result of repeated <br /> inadequate submissions by Contractor. <br /> 8. While.at the Site, compliance by ENGINEER and its staff with those terms of OWNER's or Contractor's <br /> safety grogram provide;to ENGINEER subsequent to the Effective Date that exceed those normally <br /> required of;engineering personnel by federal, State, or local safety authorities for similar construction <br /> sites. <br /> 9. Coordination and/or resporse to review comments,questions,requests or any correspondence(written <br /> or verbal)by any entities outside of direct Town employees, boards, commissions, and MassDEP. <br /> https://projects-norlhamedca.ghd.comisites/na04 03/proptownofmashpeesta/ProposaiDocs/11229548-AGR-Amendment 4 Mashpee CPS.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.