MASHPEE ZONING BOARD OF APPEALS
<br />DECISION FOR A SPECIAL PERMIT
<br />Petitioners, Jamie and Paul Saganey
<br />(Owner of Record: Daniel J. Saganey, Trustee of the
<br />Poppy Realty Trust)
<br />28 Jeep Place (Map 118 Parcel 108)
<br />Mashpee, MA 02649
<br />SP-2019-53
<br />1. The Board has determined that the applicant meets all the conditions of a Special
<br />Permit under Mass General Law 40A Section 9.
<br />2. Plot Plan — Existing House, Prepared for Jamie and Paul Saganey, 28 Jeep Place,
<br />Mashpee, MA. Existing Conditions: 1 of 3, Scale: 1" = 20', Date: June 11, 2019,
<br />Drawn: EJP, MRT, Checked by: TB, Job Number: 19013, Revisions: Changed
<br />Dune Delineation, Added Coastal Bank Sections, August 15, 2019, Drawing
<br />Number: B24-44, Prepared by: BSS Design.
<br />3. Plot Plan — Proposed House, Prepared for Jamie and Paul Saganey, 28 Jeep Place,
<br />Site Plan: 2 of 3, Scale: 1" = 20% Date: June 11, 2019, Drawn: MRT, TJB, Checked
<br />by: JER, Job Number: 19013. Revisions: Changed dune delineation, moved and
<br />rotated garage, adjusted planting, August 15, 2019, TJB, Reconfigured patio,
<br />September 3, 2019, by TJB, Prepared by: BSS Design. Page 3 of 3: SSDS Profile
<br />and Details.
<br />4. House Plans: Saganey Residence, 28 Jeep Place, Mashpee, MA. Prepared by:
<br />Archi-Tech Associate, Inc., Job No: 1813, Date: 14 August 2019, Scale: As noted
<br />(1/4" = l'), Drawn by: JAL/ELC, A- 1: Foundation Plan & Details, A-2: First Floor
<br />Plan, A-3: Second Floor Plan, A-4: Exterior Elevations, A-5: Exterior Elevations.
<br />5. Conditioned on all Town Department comments read into the record.
<br />6. Conditioned that the garage to have an unfinished space above with no plumbing
<br />or heating.
<br />
|