Laserfiche WebLink
j +J Town of�Yfashpee <br /> N\ y 16 Gi ,at ,%ck 1�oad vX01'l�i <br /> hb, Washpec,Massachusetts 0-9649 <br /> MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A VARIANCE <br /> V-2019-57 <br /> Owner,Diana M. Leccese Doc.: 1209401 <br /> 44 Barbary Circle Ctf.: 199061 <br /> (Map 96 Parcel 104G) <br /> Mashpee, MA 02649 <br /> A Petition was filed on October 24, 2019 by Owner, Diana Leccese requesting Variance <br /> relief from the side and front yard setbacks, and lot coverage under §174-31 of the Zoning <br /> Bylaws to allow for changes, extensions or alterations of a pre-existing, non-conforming <br /> single-family structure on property located in an R-3 Zoning District,at 44 Barbary Circle, <br /> Map 96 Parcel 104G, Mashpee, MA. <br /> Notice was duly given to abutters in accordance with Massachusetts General Laws Chapter <br /> 40A. Notice was given by publication in The Mashpee Enterprise, a newspaper of general <br /> circulation in the Town of Mashpee, on November 15, 2019 and November 22, 2019 a <br /> copy of which is attached hereto and made a part hereof. <br /> The Mashpee Zoning Board of Appeals issues this Decision pursuant to the provisions of <br /> Massachusetts General Laws Chapter 40A §10 and the Town of Mashpee Zoning By-laws. <br /> Public Hearings were held on the Petition at the Mashpee Town Hall on Wednesday, <br /> January 8,2020 at which time the following members of the Board of Appeals were present <br /> and acting throughout; Chairman, Jonathan Furbush, Vice Chairman, William Blaisdell, <br /> Board Members, Ron Bonvie, Scott Goldstein, and Associate Member, James Reiffarth. <br /> Mr. Steve Cook, Cotuit Bay Design represented Diana Leccese for the renovation project. <br /> The house was built in 1982 located on the Mashpee River and is pre-existing, non- <br /> conforming because it's 26.9 ft. from the front property line. The property has a steep drop- <br /> off toward the river behind the house. The homeowner would like to expand the garage 12 <br /> ft. towards the street, and 4 ft. towards the south property line in order to construct a porch <br /> between the garage and the existing part of the house. The proposed addition on the garage <br /> will be 28 ft. from the property line, so it's over 1 ft. behind the non-conforming part of <br /> the house off the front property line. The side setback is currently 34. 2 ft. and the proposed <br /> is 30 ft., which meets the requirements. The lot coverage is 13.4% and also meets the <br /> requirements. The project was approved by the Board of Health and Conservation <br /> Commission. There's no encroachment toward the coastal bank; it's just a 4 ft. extension <br /> toward the building line. <br /> Mr. Furbush asked what the distance was for the shed to the property line. Mr. Cook said <br /> it is 5 ft. from the property line and it's an 8' x 10' shed. <br /> 1 <br />