Laserfiche WebLink
Town of Mashpee <br /> 96 Great Jfeck!Pqad X6rth <br /> d" ATuslWee,Mosachusetts 02649 <br /> BOARD OF HEALTH COMMENTS <br /> NOVEMBER 18, 2020 <br /> 150 Pimlico Pond Road: BOH Comments: No comment. <br /> 16 Spoondrift Circle: <br /> BOH Comments: Septic plan and architectural plans approved for three bedrooms. A. <br /> rodent control inspection is required to be performed by an agent of the BOH and an <br /> asbestos inspection must be performed by a private asbestos inspector as part of the <br /> dentolition checklist Demolition checklist shall be completed prior to demo permit sign- <br /> off. A disposal works construction permit is required to install the new Title V septic <br /> system. The building permit will not be issued until the septic permit is obtained by the <br /> licensed septic installer. <br /> 107 Niniaret Ave: <br /> BOH Comments: Floor plaits approved for three bedrooms. Septic inspection <br /> performed. A rodent control inspection has been performed by an agent of the BOH and <br /> an asbestos inspection must be performed by a private asbestos inspector as part of the <br /> demolition checklist. Demolition checklist shall be completed prior to demo permit sign- <br /> ofj: Existing septic system to be ntilizea! <br /> 63 Waterline Drive South: BOH Comments: No comments. <br /> 24 Uncle Perevs Road: <br /> BOH Comments: The existing three-bedroom septic is to be utilized. The proposed floor <br /> plaits have four bedrooms as shown. The officelsitting area has a standard door so the <br /> r^.t.'::: has privacy and C-0:3-11idered a beds oon.-per Y OM bedroom definitimn. JA3 <br /> control inspection is required to be performed by an agent of the BOH and an asbestos <br /> inspection must be performed by a private asbestos inspector as part of the demolition <br /> checklist. Demolition checklist shall be completed prior to demo permit sign-off. A <br /> septic inspection is required due to the change in footprint. The inspection report shall <br /> be uploaded as part of the building permit application. <br /> 950 Falmouth Road Olaute 28): <br /> BOII Comments: The BOH approved the concept of the septic system for the proposed <br /> residential development on September 24, 2020. An approval letter was prepared on <br /> September 25,2020 outlining the board's conditions for approval. The technical review <br /> is on-going and any comments will be directed to the designing engineer. <br />