My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/28/2021 ZONING BOARD OF APPEALS Minutes
>
04/28/2021 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 11:02:07 AM
Creation date
11/10/2021 3:03:22 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
04/28/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Evergreen Energy, LLC <br /> 30 Evergreen Circle (Map 19 Parcel 10-3) <br /> Mashpee, MA 02649 <br /> SP-2021-31 <br /> • A landscape plan be required per the Design Review. <br /> • The tracking of material onto the road be abated by providing a minimum 20 ft. deep <br /> paved apron, and a 30 ft. tracking pad be maintained by the property owner, and any <br /> material that is tracked out onto Evergreen Circle that the owner arrange for sweeping of <br /> that material on a regular basis as needed per the DPW Director. <br /> • A fence be erected on Lot 3 to deter encroachment problems on the northern property <br /> line. <br /> • The drainage that is provided includes a subsurface component,like the existing leaching <br /> pit. <br /> • That port-a-pots are made available for employees. <br /> • No permanent fuel stored onsite without Fire Department approval. <br /> • The distance requirement for the mulch piles be confirmed. <br /> • The application be updated according to Bylaw Section 174-41 per AG's approval. <br /> 4. Conditioned that Charlie Rowley or his replacement approve the plan at the owner's <br /> expense. <br /> 5. Conditioned upon the comments submitted by the Board of Health including a port- <br /> o-pot be onsite. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.