Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Evergreen Energy, LLC <br /> 41 Evergreen Circle (Map 19 Parcel 10-9) <br /> Mashpee, MA 02649 <br /> SP-2021-32 <br /> 3. Conditioned on all Town Department comments read into the record including but <br /> not limited to the Plan Review comments; <br /> • A landscape plan be required per the Design Review. <br /> • The tracking of material onto the road be abated by providing a minimum 20 ft. deep <br /> paved apron, and a 30 ft. tracking pad be maintained by the property owner, and any <br /> material that is tracked out onto Evergreen Circle, the owner arranges for sweeping of <br /> that material on a regular basis as needed per the DPW Director. <br /> • A fence be erected on Lot 3 to deter encroachment problems on the northern property <br /> line. <br /> • The drainage that is provided includes a subsurface component like the existing leaching <br /> pit. <br /> • That port-a-pots are made available for employees. <br /> • No permanent fuel stored onsite without Fire Department approval. <br /> • The distance requirement for the mulch piles be confirmed. <br /> • The application be updated according to Bylaw Section 174-41 per AG's approval. <br /> 4. Conditioned that Charlie Rowley or his replacement approve the plan at the owner's <br /> expense. <br /> 5. Conditioned upon the comments submitted by the Board of Health including a Port- <br /> o-pot be onsite. <br /> 4 <br />