Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JUNE 8,2016 <br /> The Board had a conversation regarding a recent applicant that received variance approval <br /> from the ZBA for a deck project issued prior to receiving Conservation approval,but later <br /> violated his permit with Conservation.The ZBA held a special meeting voting not to write <br /> the approved decision based on the comments submitted to the Zoning Board by <br /> Conservation. <br /> Mr.David D'Alessandro said he briefly spoke with Drew in Conservation but did not have <br /> the paperwork to review the project with him. <br /> Mr. D'Alessandro said that the existing deck is sitting on a cinder block foundation,but he <br /> would be putting in sono tubes for the new deck. He did mention to Drew that he would be <br /> putting in sono tubes, and Drew did not seem to have an issue with that. <br /> Mr.Mendoza said if the Board elects to accept this application,the Inspections Department <br /> would take responsibility to make sure Mr. D'Alessandro speaks with Conservation to go <br /> through the process if necessary. <br /> Mr. Goldstein stated that Mr. D'Alessandro might require an RDA with Conservation <br /> which is a simple process and might require legal notification. <br /> Mr. Bonvie stated that he would prefer that all future applicants apply with Conservation, <br /> if required,prior to meeting with the ZBA, as well as all other departments. <br /> The Board had a discussion and has no issues with the project,however,they would prefer <br /> to continue the project until July 13, 2016 because it is within wetlands jurisdiction and <br /> since the project requires installing sono tubes, they want to make sure that it has <br /> Conservation's approval first.The Board told the applicant that he needs to meet with Drew <br /> in Conservation as soon as possible. <br /> Mr. D'Alessandro had revised the plan depicting the dimensional requirements for the <br /> Popponesset Overlay District. <br /> Mr.Bonvie made a motion to continue the application until Wednesday,July 13,2016.Mr. <br /> Blaisdell seconded. All were in favor to accept the continuance. <br /> 14 Aries Lane: Owners, Thomas G. Badway and Leslie M. Averna request a Special <br /> Permit under §174-45.4 of the Zoning By-laws to allow for construction of a 1,478 sq. ft. <br /> accessory apartment in the basement on property located in an R-3 Zoning District, (Map <br /> 93 Parcel 29), Mashpee, MA. <br /> Mr. Bonvie recused himself of this hearing. Mr. Gould will be sitting in on this hearing. <br /> 3 <br />