Laserfiche WebLink
Special Permits <br /> Windchime Point, Inc. <br /> Windchime Point Condominium <br /> Great Neck Road South-Minor Site Plan Approval <br /> Road Paring to Wastewater Treatment Plant <br /> References were made to a letter submitted by Charles <br /> Rowley, dated April 20, 2005, regarding Windchime- Point <br /> Drainage for Sewer Tteatr ent Plant Road. <br /> Mr. Rowley -stated them are a few minor issues that he- <br /> will <br /> bring to the attention of Applicant' s engineer. He <br /> could like to inquire about t-he location of two (2) etch <br /> basins, and some input regarding drainage calcula;ti-ons. He <br /> is suggesting that the double gate/fencing (for access) <br /> show on the plan. <br /> There being no further Board. or Public comment the <br /> Chairman entertained a motion. <br /> MOTION: Steve Dolan made- a Motion to endorse the <br /> Minor Site Plan Approval, Road Paring to Wastewater <br /> Treatment Plant, subject to the recommendations made in a <br /> letter prepared by Charles Rowley dated April 20, 2005, and <br /> Galan dated April 8, 2 ; which Motion was duly -seconded by <br /> Dennis Balzarini and so voted unanimously. <br /> Definitive Plan <br /> Andrew ConwayBSS Design - Wags Road <br /> Signature of Definitive Subdivision Plan Modification <br /> For Roadway Design <br /> The Chairman .recognized Attorney Kevin Kirrane, <br /> representing Applicant, who stated the only remaining issue <br /> in this matter is the signature of the plan. <br /> Eric Smith informed the Board that everything is in <br /> order and that no appeals have been filed. <br /> Board signature: Beverly Kane., Dennis Balzarini, Lee <br /> Gurney, Steve Dolan, and John Halachis - Plan entitled, <br /> "Wads Road Construction, by Dry Harbor Enterprises Sheets 1 <br /> and 2, Existing Wags Road Layout, Mash e , MA, <br /> Modification, Reprised March 9, 2 . " . <br /> (The Planning Board recessed the Meeting at this <br /> point, : o p.m. and reconvened at 8.: 35 p.m. ) <br /> 1 <br />