My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2014 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2010-2019
>
2014
>
04/23/2014 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 4:10:15 PM
Creation date
1/19/2022 4:09:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br />APRIL 23, 2014 <br />MINUTES <br />It is completely developed for a single-family dwelling and the plan is to demolish the old <br />house and construct a new house. The current house does not meet the setback zoning <br />requirements, and also does not meet the FEMA standards for construction a flood zone. It <br />includes a basement below space with a heating systems and storage that is not allowed <br />under FEMA standards in a flood zone. The new home will not have a basement, it will be <br />constructed and designed for compliance with FEMA standards; building code standards <br />in Flood Zone A. There is a prediction of still water flooding with no wave energy to certain <br />elevations so the first floor will be designed for the elevated one foot above the predicted <br />base flood elevation and there will be no below grade space in this building. <br />The reconstruction of the house will include a lot of significant improvements than what <br />currently exists today. The current septic system is less than 100 feet from wetland <br />resources and the new septic system will be sighted so that all components in excess of 100 <br />feet from wetlands. The current setbacks will double from the average 4 feet from the <br />structure and will become 8 feet. There is currently no roof drainage system so there is <br />potential for erosion from the roof runoff. There will be a dry well system incorporated <br />into the new house design and most importantly from an environmental point of view, there <br />is currently no native buffer between the structures and wetland resources, it's basically a <br />lawn area. The new developed lot will have a significant area of native buffer between the <br />house and the native resources. <br />• The applicants have been in before the Board of Health and was approved for the setback <br />relief from the components of the septic system. The Conservation Commission issued a <br />notice of intent and granted an order of conditions approving this project on April 16, 2014. <br />All the work associated with razing and reconstruction of this house is an overall <br />improvement environmentally to the neighborhood. <br />Mr. Wall returned and stated the standard to achieve approval from the Board is whether <br />the proposed structure is not substantially more detrimental to the neighborhood than the <br />existing structure. To make a case is to focus on the bylaw and the qualitative structure <br />relative to the other structures in the neighborhood. The existing structure is less than 50 <br />feet from the wetlands and therefore does not defy the Section 174-33 that the new structure <br />will comply and become less non -conforming. The existing structure is non-compliant with <br />the side setback requirements, as close on one side as 4 feet, and the other side 4.5 feet. <br />The new structure will be nearly 10 feet; 9 feet on one and 8.5 feet on the other and as a <br />result the non -conforming nature of the existing structure will improve a 100%, doubling <br />the existing setback. <br />Mr. Borselli mentioned the existing structure has a basement and its living space is not <br />elevated above the flood plain; Sections 174-59 through 174-63 has several provisions <br />regarding construction in the flood plain and the existing structure does not comply. It's <br />obviously grand -fathered but it doesn't comply. The new structure will be elevated above <br />the flood plain with the mechanicals above and will have no basement, so it will become <br />• more conforming to the bylaw, less non -conforming and will comply with applicable <br />building codes for development in flood zones. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.