MASHPEE ZONING BOARD OF APPEALS
<br />MAY 14, 2014
<br />MINUTES
<br />Jonathan read the comment from Conservation stating; "14 Pem Lane, is permitted through
<br />Conservation and has no issues."
<br />Mr. Bonvie made a motion to issue Theodor Ell a Written Finding under Article V § 174-
<br />17 of the Zoning By-laws and M.G.L. Chapter 40A §6 concerning continuance, extension
<br />or alteration of a pre-existing, non -conforming structure to allow for construction of a first
<br />floor garage and second floor bath on property located in an R-5 Zoning District at 14 Pem
<br />Lane (Map 89 Parcel 3G), Mashpee, MA. This Finding is issued pending condition
<br />requirement from Board of Health regarding repair of the UV light and inspection prior to
<br />issuing the Building Permit. Referencing the Site Plan prepared for Theodore Ell, 14 Pem
<br />Lane, Mashpee, MA, prepared by J.E. Landers-Cauley, P.E. Civil Environmental
<br />Engineering, PO Box 364, West Falmouth, MA. Job No. 2379, dated 04/10/14, Sheet 1 of
<br />1. A set of house plans and elevation plans titled: New Addition/Remodeling for Ell
<br />Residence, 14 Pem Lane, Mashpee, MA. Prepared by Cotuit Bay Design, LLC, 43
<br />Brewster Road, Mashpee, MA. A-1 and A-2. Scale: Y0 = V-0", dated 4/10/2014. The
<br />Board finds the design is not substantially more detrimental than the existing non-
<br />conforming structure. The dwelling will be an improvement and conform to current
<br />building code requirements, is comparable in size and character to other structures in the
<br />neighborhood, and has sufficient parking setbacks as may be required.
<br />• Mr. Blaisdell seconded, yes, Mr. Furbush, yes, Mr. Reiffarth yes, Mr. Jodka, yes. All were
<br />in favor.
<br />OTHER BUSINESS:
<br />Housing Assistance Corporation: To discuss final site plans, landscaping, and "punch
<br />list' items for Great Cove Community/Breezy Acres, 40B Comprehensive Permit.
<br />Ms. Adrienne Danner, introduced herself to the Board requesting the final certificate of
<br />occupancy on the fifth building. She stated the building has already been inspected per the
<br />Comprehensive Permit. The final site work, paving, landscaping, line stripping, and bio -
<br />retention areas are complete.
<br />Mr. Forbush referenced a letter from Charles L. Rowley, dated May 14, 2014, (Mr. Furbush
<br />did not read the entire letter, just the last paragraph); "Today I walked the site with
<br />Adrienne Danner, of the Housing Assistance Corporation, Christian Valle, General
<br />Contractor and Brian Kuchar of Horsely Witten Group for a final site inspection. It is my
<br />please to report that the project has been completed in substantial compliance with the
<br />approved plans and I recommend a release of the last building in accordance with the
<br />provisions of Condition 19 of the Special Permit. Very truly yours, Charles L. Rowley, PE,
<br />PLS, Engineering Consultant to Mashpee Zoning Board of Appeals."
<br />(a
<br />
|