Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />MAY 14, 2014 <br />MINUTES <br />Jonathan read the comment from Conservation stating; "14 Pem Lane, is permitted through <br />Conservation and has no issues." <br />Mr. Bonvie made a motion to issue Theodor Ell a Written Finding under Article V § 174- <br />17 of the Zoning By-laws and M.G.L. Chapter 40A §6 concerning continuance, extension <br />or alteration of a pre-existing, non -conforming structure to allow for construction of a first <br />floor garage and second floor bath on property located in an R-5 Zoning District at 14 Pem <br />Lane (Map 89 Parcel 3G), Mashpee, MA. This Finding is issued pending condition <br />requirement from Board of Health regarding repair of the UV light and inspection prior to <br />issuing the Building Permit. Referencing the Site Plan prepared for Theodore Ell, 14 Pem <br />Lane, Mashpee, MA, prepared by J.E. Landers-Cauley, P.E. Civil Environmental <br />Engineering, PO Box 364, West Falmouth, MA. Job No. 2379, dated 04/10/14, Sheet 1 of <br />1. A set of house plans and elevation plans titled: New Addition/Remodeling for Ell <br />Residence, 14 Pem Lane, Mashpee, MA. Prepared by Cotuit Bay Design, LLC, 43 <br />Brewster Road, Mashpee, MA. A-1 and A-2. Scale: Y0 = V-0", dated 4/10/2014. The <br />Board finds the design is not substantially more detrimental than the existing non- <br />conforming structure. The dwelling will be an improvement and conform to current <br />building code requirements, is comparable in size and character to other structures in the <br />neighborhood, and has sufficient parking setbacks as may be required. <br />• Mr. Blaisdell seconded, yes, Mr. Furbush, yes, Mr. Reiffarth yes, Mr. Jodka, yes. All were <br />in favor. <br />OTHER BUSINESS: <br />Housing Assistance Corporation: To discuss final site plans, landscaping, and "punch <br />list' items for Great Cove Community/Breezy Acres, 40B Comprehensive Permit. <br />Ms. Adrienne Danner, introduced herself to the Board requesting the final certificate of <br />occupancy on the fifth building. She stated the building has already been inspected per the <br />Comprehensive Permit. The final site work, paving, landscaping, line stripping, and bio - <br />retention areas are complete. <br />Mr. Forbush referenced a letter from Charles L. Rowley, dated May 14, 2014, (Mr. Furbush <br />did not read the entire letter, just the last paragraph); "Today I walked the site with <br />Adrienne Danner, of the Housing Assistance Corporation, Christian Valle, General <br />Contractor and Brian Kuchar of Horsely Witten Group for a final site inspection. It is my <br />please to report that the project has been completed in substantial compliance with the <br />approved plans and I recommend a release of the last building in accordance with the <br />provisions of Condition 19 of the Special Permit. Very truly yours, Charles L. Rowley, PE, <br />PLS, Engineering Consultant to Mashpee Zoning Board of Appeals." <br />(a <br />