My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/18/2021 Annual Town Meeting
>
10/18/2021 Annual Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 10:16:15 AM
Creation date
1/20/2022 10:16:11 AM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Motion Made By The Petitioner Virginia Scharfenberg <br /> <br />I move the Town vote to approve Article 22 as printed in the warrant with the exception of the phrase, “or <br />take any other action relating thereto.” <br />Motion passes 104/102 at 7:25 PM <br />Vote to reconsider at 7:33 <br />Motion to reconsider fails at 7:36 PM <br />Motion passes at 7:36 PM <br />Article 23 <br />To see if the Town will vote to amend Article VII Land Space Requirement, Section 174-31, Land Space Requirement <br />Table by adding footnote "25" to "maximum of lot coverage (percent).” Footnote 25 would read as follows: <br />Structures erected solely for the purpose of roof-mounted solar energy systems in permitted parking lots/areas shall <br />not contribute to a parcel's lot coverage maximum but shall comply with all setback criteria of the applicable zoning <br />district. For medium and large scale solar energy systems requiring a special permit from the Planning Board, pursuant <br />to Sec XXXX Solar Energy Systems Overlay District, the Planning Board may, at its sole discretion, approve in its <br />decision a solar energy system whose lot coverage exceeds 20% in consideration of site specific conditions. <br />Submitted by Petition <br /> <br />Explanation: Rationale and support for zoning change to enhance the density of solar projects in Mashpee: In 2018 <br />the Commonwealth of Massachusetts put forth a new solar initiative called the Smart program. This groundbreaking <br />concept will help Massachusetts be a leader in solar energy. Given the high cost of land in Mashpee, it is essential to <br />achieve enough density to make a solar project meaningful. The proposed footnote to the By-Law will give the <br />planning board sufficient tools and oversight to achieve an appropriate balance between solar project density and the <br />needs of the community. <br />The Board of Selectmen will make a recommendation on Article 23 at Town Meeting <br />The Finance Committee will make a recommendation on Article 23 at Town Meeting <br /> <br />Motion Made By The Petitioner: Robert Mills <br /> <br />I move the Town vote to approve Article 23 as printed in the warrant with the exception of the phrase, “or <br />take any other action relating thereto.” <br />Motion postponed indefinitely at 7:27 PM <br /> <br />Article 24 <br />To see if the Town will vote to amend §174-3 of the Mashpee Zoning By-Law, Terms Defined as follows: <br />Photovoltaic System (also referred to as Photovoltaic Installation): An active solar energy system that converts solar <br />energy directly into electricity. <br />Rated Nameplate Capacity: The maximum rated output of electric power production of a photovoltaic system in watts <br />of Direct Current (DC). <br />Solar Collector: A device, structure or a part of a device or structure for the primary purpose of harvesting solar <br />energy for use in a solar energy system. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.