My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2013 ZONING BOARD OF APPEALS Decision
>
02/13/2013 ZONING BOARD OF APPEALS Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 4:26:34 PM
Creation date
1/20/2022 2:20:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Decision
Meeting Date
02/13/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board of Appeals Mashpee Industrial Park TR -Telecommunications Tower 5. <br /> 8. The Mashpee Industrial Park Trust shall be responsible to insure that the Facility is <br /> maintained in good condition. Such maintenance shall include,but shall not be <br /> limited to, painting, structural integrity of the mount and security barrier,and <br /> maintenance of the buffer areas and landscaping. <br /> 9. At such time that the Mashpee Industrial Park Trust plans to abandon or <br /> discontinue operation of the Facility,it will notify the Town by certified U.S. mail <br /> of the proposed date of abandonment or discontinuation of operations. Such <br /> notice shall be given no less than 30 days prior to abandonment ar discontinuation <br /> of operations. <br /> 10. Upon abandonment or discontinuation of use of the Facility,the Mashpee <br /> Industrial Park Trust shall physically remove the Facility within 90 days from the <br /> date of abandonment or discontinuation of use. "Physically remove" shall include, <br /> but not be limited to: <br /> removal of antennas,mount,equipment shelters and security barriers from <br /> the subject property <br /> -proper disposal of the waste materials from the site in accordance with <br /> focal and state solid waste disposal regulations <br /> *restoring the location of the personal wireless service facility to its natural <br /> conditions,except that any landscaping and grading shall remain in the after <br /> condition. <br /> 11. If the Mashpee Industrial Park Trust fails to remove the Facility,the Town shall <br /> after written notice at least 30 days prior to such action, have the authority to enter <br /> the subject property and physically remove the facility. The Mashpee Industrial <br /> Park Trust shall be required to post a$10,000 bond for fifteen(15)years at the <br /> time of construction to cover costs for the removal of the Facility in the event the <br /> Town must remove the facility. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.