My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2003 PLANNING BOARD Minutes
>
06/18/2003 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 5:08:14 PM
Creation date
1/21/2022 1:36:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
06/18/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> encompasses a continuation of the Public Hearing in this <br /> matter to July 2, 2003 at 7 . o p.m. ; which Motion was <br /> .seconded by Don Myers and so voted unanimously. <br /> Public Hearing <br /> indchime Point, Inc. - windchime Point Condominium <br /> Approval of Modification to Special Permit (Storage/Garage) <br /> The Chairman recognized Tom Quinn who stated he i <br /> assisting the Trustees with the plan being proposed. He <br /> made reference to the Garage Plan to which changes have <br /> been made. <br /> The Town Planner noted there -is no actual plan for the <br /> parking lot/engineering. <br /> ]r. Quinn stated the landscaping plans around the <br /> proposed garage are incomplete. He requested feedback on <br /> two outstanding items, the front entry and drainage. <br /> The Town Planner responded a detailed plan of the <br /> front entryway is required for proper review. The sketch <br /> that was submitted does not show sufficient detail/parking <br /> _ . -space -inforation.. - --- - - - -- - - -- - - <br /> The Assistant Town Planner explained that as of this <br /> morning the Consulting Engineer had not yet been provided <br /> with plans/drainage calculations from the Applicant . <br /> Mr. Quinn stated he would provide the following <br /> information for the next Meeting - Two drawn parting spaces <br /> at the front entryway, crosswalk, and a landscaping -plan. <br /> He also stated -he would contact the Planning Staff prior t <br /> the next Meeting in order to insure that all required <br /> materials have been provided. <br /> t this point the chairman requested Applicant to <br /> provide materials to the Board in advance of the Meetings <br /> for their review. <br /> The Town Planner called upon Marty O' Malley, who <br /> represents the Trustees, to speak to the construction <br /> entrance matter. <br /> Mr. O'Malley explained this matter would be addressed <br /> at some future point to be shown on a plan in connection <br /> with Phase III . The Trustees have requested that it remain <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.