Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Page 8 - 1 . `...low lands"to be deleted. <br /> 14. Added language as follows: "Topography of the land including areas outside <br /> the property limits sufficient to show the potential impacts of storm water <br /> runoff both to the site and to adjacent-properties. Topography shall be to at <br /> mast a ' contour interval with a contour interval of 1' where particular local <br /> conditions dictate-as well as spot grades along existing roads and pavements. <br /> Spot grades on roads shall be shown sufficient to indicate the direction of <br /> storm water flow over the pavement, road crown and gutter lines." <br /> 15. Added language, "...(with five [5] lines for signatures) <br /> 1 . Language amended to read: "...cluster development `provisions'..." <br /> The Town Planner suggested signature blocks for the Tern Clerk be-added. <br /> Page 9----21. The following language has been added, "1. Cape Cod Bern or <br /> vertical curb regardless of grade except-where Low Impact Development is used." <br /> p. ` ...existing and proposed final grading..."has been added. <br /> Page 1 ---H. 1. The following language has been added, "The Board may wive <br /> or allow modifications to the design standards and required improvements of <br /> SectionV and vI if in the judgment of the Board, such action is in the public <br /> interest and not inconsistent with the Subdivision Control Law.'1 <br /> I. 3. Language has been added with respect to security, "In the,case ofthe <br /> applicant choosing to secure the release of lots through means other than <br /> covenant,the arnount of security to be posted shall be 1 0%of the base cost of all <br /> construction as determined by formal estimates submitted to the Board on <br /> contractor letterhead. This amount may be varied from time to tune and adjusted <br /> according to work completed-and approved by the Board." (Mr. Rowley will <br /> farther adjust this language to require.said estimate-to be reviewed and approved <br /> by the Consulting Engineer Planning Board.) <br /> J. Added language reads, "The Board shall, within ninety days of submission of <br /> plan where a preliminary plan was.submitted or within 135 day'where a <br /> preliminary plan was not.required, ..a`) <br /> —The Town Planner and Consulting Engineer are to further review this <br /> language,- r clafification, with reference to the sixty-day time pefiod. The <br /> extension language is to be simplified and reworded. <br /> 5 <br />