Laserfiche WebLink
p � S <br /> y <br /> �� �� <br /> rco, i C( AC}F �$ <br /> C Sf4 f 7 , <br /> MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A VARIANCE <br /> V-2011-22 <br /> Joan M. Allegrini Certificate of Title: 165230 <br /> 146 Waterway Land Court#: 80 <br /> Mashpee,MA 02649 Plan#: 11408-23 Sheet 1 <br /> Map 105 Parcel 236 <br /> A Petition was filed on May 17, 2011 by Joan M. Allegrini for a Variance from <br /> Sections 174-31 and 174-33 of the Zoning By-laws for permission to vary the front <br /> setback requirements, the lot coverage requirements and the setback requirements from <br /> water and wetlands to allow for construction of a new dwelling on property located in an <br /> R-3 zoning district at 146 Waterway(Map 105 Parcel 236)Mashpee,MA. <br /> Notice was duly given to abutters in accordance with Massachusetts General <br /> Laws Chapter 40A. Notice was given by publication in The Mashpee Enterprise, a <br /> newspaper of general circulation in the Town of Mashpee, on May 20, and May 27, 2011 <br /> a copy of which is attached hereto and made a part hereof. <br /> Public Hearings were held on the Petition at the Mashpee Town Hall on June 8, <br /> 2011. The following members of the Board were present and acting throughout: Board <br /> Members Robert G. Nelson, Jonathan D. Furbush, William A. Blaisdell and James <br /> Reiffarth, and Associate Member Judith M. Horton. <br /> The Mashpee Zoning Board of Appeals issues this Decision pursuant to the <br /> provisions of Massachusetts General Laws Chapter 40A §10 and the Town of Mashpee <br /> Zoning By-laws. <br /> Attorney Kevin M. Kirrane and Cape & Islands Engineer John Slavinsky <br /> represented the Petitioner. Attorney Kirrane submitted photos of the existing dwelling <br /> along with a landscape plan and plantings report developed by Michael Talbot. Plans call <br /> for demolition and replacement of the existing dwelling, as well as installation of a pool <br /> and screened porch on the subject property. <br /> The subject property slopes severely from Waterway to Popponesset Creek. <br /> Attorney Kirrane said that presence of the Coastal Bank on most of the lot and actually <br /> running through the existing structure makes it impossible to develop the lot without <br /> Variance relief from the front setback and lot coverage requirements and the setback <br /> requirements from water and wetlands. The proposal does meet the side and rear setback <br /> requirements. Lot coverage will increase from 12% to 21.2%. Mr. Slavinsky confirmed <br /> that the lot coverage calculation includes the screened porch, deck, pool and the two-foot <br /> wide trough. The stone patios were not included in the calculation. The Petitioner is also <br /> seeking a Finding of Fact and permission to rebuild to allow for the proposal on the pre- <br /> existing,non-conforming property. <br />