My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/26/2011 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2010-2019
>
2011
>
10/26/2011 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 11:20:03 AM
Creation date
1/26/2022 11:19:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br />OCTOBER 26, 2011 <br />MINUTES <br />• prior to building permit sign -off, a Mashpee licensed septic installer must <br />obtain a septic permit for repair of the sand filter on the existing soil <br />absorption system. <br />tank registration. <br />• Board of Selectmen and Fire Department approval of proposal to install larger - <br />capacity underground tanks. <br />• State approval of the proposal. <br />• Vanasse Hangen Brustlin, Inc. plan entitled: "Site Plans Date Issued: August 16, <br />2011; Proposed Fuel Facility 723 Falmouth Road Mashpee, Massachusetts". <br />• Vanasse Hangen Brustlin, Inc. plan entitled: "Site Plans Date Issued: August 16, <br />2011; Proposed Fuel Facility 723 Falmouth Road Mashpee, Massachusetts". Sheet <br />L-1 Landscape Plan, Note #5 shall be revised to reflect a 3 -year guarantee period <br />via watering truck or the installation of an on-site well. Public water supply shall <br />not be used for irrigation. Two (2) full-size copies of revised Sheet L -I shall be <br />submitted to the Building Department and ZBA. <br />• Agnoli Sign Company, Inc. plan entitled: "Gas Station Signage Elevations Date <br />Issued: September 29, 2011; Proposed Gas Development 723 Falmouth Road, <br />Mashpee, Massachusetts". Approval for signage from the Design Review <br />Committee is required — no internal lighting on canopy or signage. Petitioner will <br />submit two (2) full-size copies of final signage approval - stamped and signed - by <br />the Design Review Committee to the Building Department and ZBA. <br />• Petitioner shall submit $5,000 to the ZBA to be deposited into an account to cover <br />• ZBA consulting engineering service fees. Any balance shall be returned to the <br />Petitioner. <br />Findings: <br />• that the proposal is not substantially more detrimental than the existing non- <br />conforming structure or use to the neighborhood for the following reasons: <br />o installation of the proposed environmental safety features will be a vast <br />improvement to the property. <br />o proposed removal of a large portion of the pavement and replacement <br />with landscaping will improve the impervious condition on the property. <br />o the proposal meets the minimum land space, frontage, side, and rear <br />setback requirements. <br />o the proposal will reduce encroachment into the front setback <br />requirements. <br />OTHER BUSINESS <br />Approve/Sign Voucher: Charles L. Rowley Review of site plans concerning development <br />of project at 52 Mercantile Way - Franey Medical Laboratories, Inc. <br />Mr. Bonvie recused himself Mr. Blaisdell made a motion to approve and sign the voucher <br />to reimburse Mr. Rowley for his site review of 52 Mercantile Way. Mr. Nelson seconded <br />the motion. Ms. Horton voted yes. Mr. Furbush voted yes. Mr. Blaisdell voted yes. Mr. <br />• Nelson voted yes. Motion passed. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.