My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/27/2010 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2010-2019
>
2010
>
10/27/2010 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 2:08:24 PM
Creation date
1/28/2022 2:07:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br />MINUTES <br />October 27, 2010 <br />appear before the ZBA with those changes. Mr. Nelson also said that the proposal is <br />•' subject to approval by the Board of Health. <br />Attorney Kirrane said that the Petitioner has addressed the concerns raised by Engineer <br />Charles Rowley in his site review letter dated October 26, 2010. Revised engineering <br />plans were submitted to the ZBA office on October 27, 2010. Revisions include <br />reduction of the proposed width of the drive, elimination of the proposed retaining wall <br />from the southwesterly comer of the site and installation of swales to address runoff <br />issues. The sidewalk in front of the building will be connected to the sidewalk which will <br />provide handicap access to the building. <br />Since the driveway now conforms to the By-law, Attorney Kirrane said that the Petitioner <br />will no longer require a Variance from Section 174-31 footnote 14 or Section 174-40 of <br />the By-laws. The Petitioner is seeking a Variance from the setback requirements from <br />Job's Fishing Road and a Variance to allow encroachment into the buffer zone in order to <br />accommodate the drainage treatment and relocation of the overflow reserve pit. <br />Mr. Borselli said that Mr. Rowley's concerns were addressed with the exception of item 6 <br />conceming stormwater and septic system frames, grates and covers, which the Board <br />could condition on approval of the proposal. Mr. Borselli went through the list of items <br />with Mr. Rowley and the Board. Mr. Rowley said that he is satisfied with the revised <br />plans and requested a copy of the second sheet of the revised plans for his review. <br />Detailed landscape plans were delivered to the ZBA office on October 25, 2010, prior to <br />the revised October 27, 2010 engineered plans. Attorney Kirrane assured the Board that <br />the landscaping will be consistent with the revised engineering plans. <br />Mr. Nelson said that a catch basin proposed on the southerly lot line is within the 10 -foot <br />buffer zone, which requires a ruling by the Board as to whether or not this is permissible. <br />He said that the relocated easement for the leaching pits is also within that buffer zone. <br />Mr. Rowley suggested moving the leaching pits an additional 8 feet, then re -grading to <br />stay outside the 10 -foot buffer. Mr. Nelson mentioned that the Board should grant a <br />Variance for relocation of the easement. <br />No comments were received from abutters. <br />Mr. Blaisdell made a motion to grant a Special Permit under Sections 174-25.1)(1), 174- <br />25.E(4),'and 174-25.F(6) to allow for construction of the proposal. This is subject to the <br />following: <br />• Review by the Cape Cod Commission. The Petitioner must notify and submit to <br />the ZBA any major changes made to the Cape Cod Commission Decision. <br />• Approval by the Mashpee Board of Health. The Petitioner must notify and submit <br />to the ZBA any changes made by. the Board of Health. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.