My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/25/2022 CAPITAL IMPROVEMENT PROGRAM Minutes
>
01/25/2022 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 5:01:15 PM
Creation date
2/3/2022 2:35:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
* MINUTES CIP COMMITTEE 1-25-2022 APPROVED 2-2-2022 <br /> • Planning and Construction -Total CIP Request $2,064,805 <br /> Department: Planning & Construction <br /> Submitted by: Catherine Laurent <br /> Summary <br /> Prior Funds <br /> Project (Short Title) Appropriated FY2023 <br /> PLANNING& CONSTRUCTION <br /> Flooring Repl -Various Building $ - $ 89,640 <br /> MMHS Field Imp (CIP Portion) CPC <br /> Portion $1,709,400 Total $2,970,350 $ - $ 1,260,950 <br /> DNR Facility $ - $ 484,215 <br /> MMHS Gymnasium Upgrades $ - $ 75,000 <br /> School HVAC Upgrade (ACNentilation) $ - TBD <br /> Quashnet Gymnasium Upgrades $ - $ 155,000 <br /> Total Planning & Construction $ - $ 2,064,805 <br /> DPW Director Catherine Laurent presented the Fiscal Year 2023 Planning & Construction requests <br /> as per vote of the Planning and Construction Committee: <br /> The flooring replacement is a larger amount than in previous years as the Committee <br /> recommended that the first floor of the MMHS be done all at once. <br /> The Natural Resources facility is proposed to be finished inside to include labs, office space and <br /> furniture items. The DPW will be doing the carpentry, but contractors will be completing the <br /> electrical, plumbing, alarm systems etc.The project is predicted to be completed in the fall of 2022. <br /> The Town Manager explained that the DNR operations are currently spread out at Town Hall, the <br /> Police Department and other space near the water,this project will enable the Department to have <br /> all operations based at one address. <br /> Field Improvements are proposed at a total cost of$2,970,350 with $1,260,950 funded via Capital <br /> Improvement and the balance of $1,709,400 from Community Preservation Funds. Bids will be <br /> solicited and all will state that the execution of contracts is contingent upon the CPC and CIP articles <br /> passing at Town Meeting. <br /> MMHS gym improvements include the refinishing of the floor, replacing the curtains, scoreboard <br /> and shot clocks. The project is proposed sooner than originally thought due to the COVID pandemic <br /> and the need to utilize the gym for lunches, etc. <br /> QS gym improvements would replace the rubber (vinyl) flooring, scoreboard and curtain. <br />