My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/11/2005 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2005
>
05/11/2005 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 10:57:10 AM
Creation date
2/9/2022 10:56:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee Zoning <br />Board of Appeals Minutes <br />1 May 11, 2005 <br />. TOWN OF MASHPEE <br />Zoning Board of Appeals <br />Minutes — Wednesday, May 11, 2005 <br />The Mashpee Zoning Board of Appeals held a Public Hearing on Wednesday, May 11, <br />2005 at 7:00 p.m. at the Mashpee Town Hall. Board Members Robert Nelson, Frederick <br />Borgeson, Marshall Brem and Evano Cunha were present along with alternate member <br />Jonathan Furbush. Member Zella Elizenberry was absent.. Also present were two <br />potential ZBA alternates James Reiffarth and Eric Dublirer. <br />Mr. Nelson brought the meeting to order at 7:00 p.m. <br />Mr. Nelson had Mr. Borgeson read the last minute continuances that were to take place <br />this evening. (attached is the continuance page) <br />Mr. Nelson informs everyone that Selectman Wayne Taylor would like to address the <br />ZBA. <br />Selectmen Taylor would like to expresss to the "ZBA and the audience that the Board of <br />• Selectmen are very concerned with the traffic problems the Town of Mashpee is currently <br />facing. There are many, many business along Route 28 that generate more traffic than <br />Mashpee can handle now let alone the thought of more businesses being permitted. They <br />want to have a joint meeting with the Planning Board as well as the ZBA to put their <br />heads together. Mr. Brem asks who and when will be arranging the meeting. Mr. Taylor <br />informs him the BOS office will be in contact. He thanks the Board for their time and all <br />of their hard work as a volunteer board for the decisions they are up against. <br />0 <br />Informal: Christian Valle re: River Hill would like to discuss reducing the size of the <br />chain link fence around the drainage from 6 feet to 5 feet. <br />Christian Valle, Project Manager of the Chapter 40B project called River Hill addresses <br />the board regarding the.height of a required fence around a drainage area. The Board had <br />previously recommended a six foot high chain link fence around this area and it has been <br />brought to the attention of Mr. Valle that Mashpee only requires a five foot fence. He <br />would like permission from the Board to install a five foot fence instead of a six foot <br />fence. Mr. Brem asks him what the price difference is hopes that is not the reason. Mr. <br />Valle does not have all the numbers just yet but perhaps $1,000 - $2,000. The Board <br />refers to the letter from the engineer and feels if he thinks it is appropriate and safe they <br />have no problem with a five foot fence. Mr. Nelson makes a motion to allow the five <br />foot fence. Mr. Borgeson seconds the motion. All agree. So moved. Mr. Nelson <br />mentions that Mr. Valle should check with his insurance agent regarding this change <br />since that is referred to in the engineer's letter. Mr. Valle thanks the Board for their time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.