Laserfiche WebLink
applicant should consider reducing the overall proposed footprint of disturbances to stay <br /> out of the 50 ft buffer entirely. <br /> Assistant read comments from Board of Health and the Building Commissioner. <br /> Mr.Sweet said he supports Agent's comments and they need to respect the 50ft setback. <br /> Ms. Zollo said she agrees. We need to protect the buffer as best as we can. <br /> Mr.Sweet said they could connect to the sewer system. <br /> Mr.Colombo said any encroachment is unacceptable. We have some serious water <br /> quality problems. <br /> Raul Lizardi said he would like to ask for a continuance. He asked for clarification on if the <br /> area is planned for sewering. Mr.O'Neill said that the area is scheduled for sewering on <br /> the current sewer plans. <br /> Mr.Sweet motioned to continue until 1/27/22 at 6:09pm. <br /> Mr.Colombo seconded the motion. <br /> Vote: 5-0-0 <br /> Roll Call Vote: <br /> Mr.O'Neill; yes <br /> Mr.Colombo; yes <br /> Mr.Sweet; yes <br /> Ms. Zollo; yes <br /> Mr.Weeden; yes <br /> In favor,5; Opposed, 0; Abstentions, 0 <br /> 6:06 John Cuming, Simons Narrows, LLC(Applicant), 0 Simons Narrows Road.Proposed NOI <br /> installation of shed and fence. Owner of Record:William R.Cuming, Trustee, Popponesset <br /> Realty Trust. <br /> Raul Lizardi from Cape& Islands Engineering presented plans. John Cummings <br /> (applicant) and Mark McCarthy(developer)were present. <br /> Agent stated that there is no impact to the performance standards for BVW and salt marsh <br /> from the proposal; however, given that the shed is proposed within 30 feet of BVW, <br /> mitigation is required. Agent identified areas that are suitable for mitigation along existing <br /> grass shoulders abutting the cul-de sac where it meets wetlands. Agent asked <br /> representative to come up with a sufficient mitigation planting plan to cover these grassy <br /> areas. <br /> Assistant Agent read comments from Building Commissioner and Board of Health. She <br /> said the mitigation plan should be based on the mitigation chart. Agent said there simply <br />