Laserfiche WebLink
10. The stormwater management forni at the end'of.the report has not been signed or dated. <br /> The revised stormwater rnanagenient form is signed and dated as requested <br /> III. Plans <br /> A. Sheet S-1 <br /> 1. Unreadable dimensioning. <br /> Full size (24"x 36')Plans have been provided for the Review Engineer. <br /> 2. Is this plan to be recorded in the Barnstable Registiy.of Deeds? If so a proper registry block must <br /> be provided. <br /> A separate Plah.will be prepared and recorded with the Barnstable Registry"ofDeeds. <br /> 3. Provide a ZBA approval block. <br /> Approval block has been provided. <br /> 4. Will this plan be used to rescind the layout of Lettie Lane as shown on the Land Court plan? <br /> Yes. A separate Plan will be prepared and recorded. <br /> 5. All proposed new lot lines and dimensioning should be shown. <br /> Completed as requested, see sheet 3 of the Plan. <br /> 6. Street monuments. <br /> Street rraonuments have been Proposed at all roadway right-of-way points of curvatures and tangencies as <br /> suggested. <br /> 7. Site construction details <br /> All site construction details will be provided in the Definitive Subdivision Plan submission for review.- <br /> -8. Identify proposed Lettie Lane starting points.within Route 130. <br /> Completed as regtcested, see sheet 3'of the Platt. <br /> 9. Reason for-requesting a waiver for the minimum curb radius to be changed from 35' to 25'. <br /> Response Letter Horsley Witten Group <br /> Maui Street Village(Lettie Lane).Mashpee,MA 4 March 5,2004 <br /> I-I:arsley Witten Group <br />