My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2004 ZONING BOARD OF APPEALS Minutes
>
03/10/2004 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 5:02:27 PM
Creation date
2/10/2022 11:46:16 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
03/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A grading and paving plan showing all necessary spot grades and dintehsions needed to construction the <br /> Pt'oject will be provided in the Definitive Subdivision Plan. <br /> i. Wastewater system inverts,manhole grades,pipe lengths and utility crossings. <br /> Provided in the Definitive Subdivision Plant. <br /> J. Watermain Site. <br /> Provided in the Definitive Subdivision Plan. <br /> C. Sheet SK-31 <br /> l. Profile Plan shows no existing and proposed grades for the road centerline. <br /> Complete roadway p°ofnles will be provided for roadway construction in the Definitive.Subdivision Plan. <br /> 2. The existing grade.at Route.130 is not shown. <br /> Route 130 grades are shown.ore the Plans. . <br /> 3. Profile details <br /> Details required to.build Lettie Lane will be provided in the Definitive Subdivision Plan. <br /> 4.. Roadway grade waiver <br /> All roadway grades shown on the Plans are in conformance with. the Maslrpee Zoning Bylaw with the <br /> r-equired landing grades oft%for the frrstfortyfeet and'4%f9r the next thirtyfeet..Xo grade waiver-is <br /> required.. <br /> IV. Further Comments <br /> A. Drainage design and snow removal. <br /> Drainage design concerns were discussed at our kfeeting*with Mr. Rowley on February 27, 2004.. HW <br /> believes that we haveaddressed all'ofMr. Rowley's-concerns ill regards to;drainage by leans of this <br /> response letter-,,additional calculations, the,revised drainage ndr-r-ative, antd the revised Plans. <br /> B. Catchbasin interval requirements in accordance with Town Rules &Regulations. <br /> Catchbasin intervals are in conformance with the Towns R&R's.(see Site Plan). <br /> C. Recommend including frozen ground condition leaching pits in bioretention facilities. <br /> Corizplered as requested,'see sheet 5 of the Plant. <br /> Response Letter Hoisley.Witten Group <br /> Main Street Village(Lettie Lane)Mashpee,MA . 7 March 5, 2004 <br /> Horsley Witten Group <br /> calVirl:::t1i'�?i'cf <br />
The URL can be used to link to this page
Your browser does not support the video tag.