My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2004 ZONING BOARD OF APPEALS Minutes
>
03/10/2004 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 5:02:27 PM
Creation date
2/10/2022 11:46:16 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
03/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
26.C(1). The applicant requests that the market rate units also be <br /> exempted from the phasing requirements to facilitate construction. <br /> 8) Section 174-27: Water Quality Report <br /> Applicant requests a waiver from Water Quality Report requirements. <br /> The existing Site Plan incorporates the use of innovative storrnwater and <br /> wastewater design to reduce pollutant loading. All wastewater design is in <br /> compliance with Title 5 requirements. <br /> Article VII-Ladd Space Requirements <br /> 9) Section 174-28: Conformance Required <br /> See waiver request#10 <br /> 10) Section 174-31: Land Space Requirements Table <br /> Applicant requests a waiver for minimum lot coverage and property line <br /> setbacks. <br /> Article XIII-Groundwater Protection District <br /> 11) Section 174-82: Special Permit Uses; application procedure <br /> The proposed development will render impervious more than 15% of an <br /> individual lot. Although the applicant will meet all of the performance <br /> standards for stormwater management listed triggered by this level of <br /> impervious cover under this section of the Bylaw, the applicant requests a <br /> waiver from the special permit process. <br /> SUBDIVISION RULES AND REGULATIONS DATED MARCH 4, 2004 <br /> Section VILA <br /> 1) Item 6: Requited turn-around for dead end street <br /> The applicant has proposed a turn around cul-de-sac with an outside <br /> diameter of 90-feet and a property line diameter of 110-feet. This is a <br /> variance from the standard 100-foot outside diameter and 120-foot <br /> property line diameter to reduce enviromnental impacts of the project. <br /> 2) Item 7: Length of dead end streets. <br /> The length of the proposed dead end street exceeds the reconnrnended <br /> maximum of 800-feet by approximately 221=feet include. <br />
The URL can be used to link to this page
Your browser does not support the video tag.