Laserfiche WebLink
Roadway Cost Breakdown <br /> Based on Plans by Horsley Witten Group dated 3/5/04 <br /> Total Length of Paved Roadway to be.Constructed: 1320 Feet <br /> Portions of roadway directly attributed to commercial site: 260 Feet <br /> Section#1 - 1/2 of entrance,rotary length: 200' <br /> Section#2-Curb cut at 2nd parking exit: 60' <br /> Proportionat Responsibility for Roadway costs• <br /> 1. Residential Development(40B)(1 128/13-2-8—)--F 80% <br /> 2. Commecial Development(200/1328) 20' <br /> Total Roadway and Drainage Costs: $346;000 <br /> Estimated Line Item Breakdown _ <br /> Clearing 1. Is 11,000 <br /> Stump removal $ 22,000 <br /> Cut/Fill, Grading $ .62,000 <br /> Electrical Services $ 28,000 <br /> Water Mains $ 67,000 <br /> Drainage 1 $ 84,000 <br /> Fine Grade/Paving $ 72,000 <br /> Total $346,000 <br /> Costs to Residential Portion(80%) $277,000 <br /> Costs to Commercial Portion (20%) $69,000 <br />