My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2004 ZONING BOARD OF APPEALS Minutes
>
03/10/2004 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 5:02:27 PM
Creation date
2/10/2022 11:46:16 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
03/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Roadway Cost Breakdown <br /> Based on Plans by Horsley Witten Group dated 3/5/04 <br /> Total Length of Paved Roadway to be.Constructed: 1320 Feet <br /> Portions of roadway directly attributed to commercial site: 260 Feet <br /> Section#1 - 1/2 of entrance,rotary length: 200' <br /> Section#2-Curb cut at 2nd parking exit: 60' <br /> Proportionat Responsibility for Roadway costs• <br /> 1. Residential Development(40B)(1 128/13-2-8—)--F 80% <br /> 2. Commecial Development(200/1328) 20' <br /> Total Roadway and Drainage Costs: $346;000 <br /> Estimated Line Item Breakdown _ <br /> Clearing 1. Is 11,000 <br /> Stump removal $ 22,000 <br /> Cut/Fill, Grading $ .62,000 <br /> Electrical Services $ 28,000 <br /> Water Mains $ 67,000 <br /> Drainage 1 $ 84,000 <br /> Fine Grade/Paving $ 72,000 <br /> Total $346,000 <br /> Costs to Residential Portion(80%) $277,000 <br /> Costs to Commercial Portion (20%) $69,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.