My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2004 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2004
>
03/10/2004 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 12:23:47 PM
Creation date
2/10/2022 11:47:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF ZONING RELIEF REQUIRED <br /> RT 130 PROJECT—MASHPEE <br /> MASHPEE ZONING BYLAW-DATED MARCH 4, 2004 <br /> Article IV-Application of Regulations <br /> 1) Section 174-9: Compliance Required <br /> See requested waivers#2 and#3 <br /> 2) Section 174-11: Lots Located in Multiple Zoning Districts <br /> The client is proposing to locate residential development(lot#9)in what <br /> would otherwise be considered a commercial zone (C-2), as the majority <br /> of this lot lies within the commercially zoned area. <br /> 3) Section 174-12: Location of Buildings on Lots <br /> Two of the proposed lots (Lot#9 and Lot 910) have two principal <br /> buildings proposed in the form of multi-unit"quads". <br /> Article V-Nonconforncing Buildings and Uses <br /> 4) Section 174-21: Nonconforming Lots u <br /> The proposed residential lots within the R-5 zoning district do not comply <br /> with the minimum lot size of 80,000 square feet. <br /> Article VI-Land Use Regulations <br /> 5) Section 174-22: Compliance of Land Use <br /> See waiver requests #6 and#7 <br /> 6) Section 174-25: Table of Use Regulations <br /> Applicant requests a waiver from Special Permit requirements relative to <br /> residential development in a commercial zone (C-2). <br /> 7) Section 174-26: Growth Management <br /> The affordable units within the development will be exempt from the <br /> standard construction phasing required by the Town pursuant to 174- <br />
The URL can be used to link to this page
Your browser does not support the video tag.