My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2004 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2004
>
03/10/2004 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 12:23:47 PM
Creation date
2/10/2022 11:47:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadway Cost Breakdown <br /> Based on Plans by Horsley Witten Group dated 3/5/04 . <br /> • Total Length of Paved Roadway to be Constructed: 1320 Feet <br /> Portions of roadway directly attributed to commercial site: 260 Feet <br /> Section #1 - 1/2 of entrance rotary length: 200' <br /> Section#2 Curb cut at 2nd parking exit: 60' <br /> Pr000rtionat Responsibility for Roadway-costs., <br /> 1.Residential Development(40B)(1128/1328) 80% <br /> 2. Commecial Development(200/1328) 202J. <br /> Total Roadway and Drainage Costs• $346,000 <br /> Estimated Line Item Breakdown <br /> Clearing $ 11,000 <br /> Stump removal $ 22,000 <br /> Cut/Fill, Grading $ 62,000 <br /> Electrical Services $ 28,000 <br /> Water Mains $ 67,000 <br /> Drainage $ 84,000 <br /> Fine Grade/ Paving $ 72,000 <br /> Total $346,000 <br /> IDCosts to Residential Portion (80%) $277,000 <br /> ICosts to Commercial Portion (20%) $69,000 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.