Laserfiche WebLink
Mashpee Zoning <br /> Board of Appeal Marion DeWillis <br /> 3 SP-04-33 <br /> 11, will not cause excessive erosion or cause increased runoff onto neighboring <br /> properties or into any natural river, stream, pond or water body and will not <br /> otherwise be detrimental to the town or the area. <br /> 12. will be an improvement with installation of a new Title V septic system. <br /> In view of the foregoing, the Mashpee Zoning Board of Appeals found that the <br /> applicant met the criteria necessary for the granting of a Special Permit. Upon motion <br /> duly made and seconded,the Zoning Board of Appeals voted unanimously on February <br /> 25, 2004 to grant the Special Permit conditioned on compliance with engineering plans <br /> from Stenbeck and Taylor, Inc. of Marshfield, MA, Job No. 6758, dated January 9, 2004. <br /> a 5 <br /> 1j <br />