My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/26/2003 ZONING BOARD OF APPEALS Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2003
>
02/26/2003 ZONING BOARD OF APPEALS Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 3:17:34 PM
Creation date
2/11/2022 3:13:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee Zoning <br />Board of Appeals <br />0 <br />TOWN OF MASHPEE <br />a 21� PUBLIC <br />IEARINGS <br />NOTICE <br />The Masnpee Zoning Board of Appeals will hold <br />Public Hearings on Weanesday, February 26, 2003 <br />at 7:00 P.M. at the Mashpee Town Hall, 16 Great <br />Neck Road North. on the follbunmil <br />Jamie Romkey: Requests A Va cihbe Ilam Sinton <br />174-31 of the Zoning By-laws to vary me front and <br />side setbacks to a miner lot In.hoer to add a 24' x 24' <br />garage to an existing house on property located In an <br />R3 zoning district at 20 Windsor Way (Map 29 <br />Parcel 165) Mashpee, MA. <br />Bourne Petroleum: Requests a Variance from <br />Section 17131of Me Zoning Bydews to vary Ne <br />setback requirements in order to erect a 24' x 30 <br />canopy In front of the food mart on property (mated In <br />an R-5 zoning district at 135 Main Street (Map 37 <br />Parcel 58) Mashpee, MA. Owner of Record: S. <br />Joseph DiMappio <br />Bourne Petroleum: Requests a Special Permit under <br />Sections 174-17 and 170.25 of the Zoning Bylaws in <br />order to expand a pre-existing non -conforming service <br />station on property located In an R 5 zoning district at <br />135 Main Street (Map 37 Parcel 58) Masnpee. MA. <br />Owner of Record: S. Jose pheqDIMdgglO <br />Paul and Kristen Hanlon: Ruest a Variance from <br />Section 174.31 of the Zoning By-laws to vary the lot <br />0erage requirements and side setback <br />(laments in order to Install a 32 a 1' pool on <br />perly located In an R3 zoning district at 51 <br />." ponesset Island Road (Map 106 Parcel 13) <br />Mashpee, MA. <br />Michael Sliwa: Requests a Variance from SEmim <br />174-31 of the Zoning Bydaws to vary, Ne land space <br />requirements and sideyard setback requirements in <br />order to build a 12 x 11' sunrmm and 26' x 32' <br />addition on property located in an R3 zoning district <br />at 93 Redbrock Road (Map 110 Parcel 63) Mashole, <br />MA, <br />Michael Sliwa. Requests a Special Permit under <br />Section 174.17 of the Zoning By-laws in order to <br />expand a nor -conforming structure on property <br />located in an R3 zoning district at 93 Redbrook Road <br />(Map 110 pvicel 63) Mashpee, MA. <br />Wdlowbend Country Club, Inc: Requests a <br />Variance from Secmm 174-31 of the Zoning By laws <br />in order to vary the Side Setbacks and trait setbacks <br />on property located in an R-3 zoning mstoct at 31 <br />North Glen Drive (Map 69 Parcel 196) Mashpee, MA. <br />Owner -of Record: Douglas Backman <br />Plans may be viewed prior to Me hearings in Me <br />office of the Town Clerk. <br />PER ORDER OF Edward M. Gorb i, Chairman <br />Mashpee Zoning Board of Appeals <br />Per order of <br />Edward M. Gown, Chairman <br />Mashpee Zoning Board of Appeals <br />1,14,21,2003 <br />0 <br />Bourne Petroleum <br />Owner of Record: S. Joseph DiMaggio <br />V-03-28 <br />IN FAVOR: <br />IN FA <br />This Decision has been duly filed on <br />APR 171003 <br />with the Town Clerk of Mashpee. Any appeals shall be <br />made pursuant to Section 17 of the Massachusetts General <br />Laws Chapter 40A within twenty days after the date of said <br />filing. <br />This Decision is effective when a Certified Copy is filed <br />at the Registry of Deeds. A Certified Copy may be <br />obtained from the Town Clerk after the expiration of the <br />20 -day Appeal period. Special Permits shall lapse after <br />two years and Variances and Appeals after one year, <br />unless substantial. use or construction has commenced <br />or applications for extensions have been filed prior to the <br />expiration date. <br />SQ : ; Edd L I six <br />
The URL can be used to link to this page
Your browser does not support the video tag.