Laserfiche WebLink
Meetinghouse Hill Plan Review <br /> Page five <br /> Mashpee in case of default by the owner. As an example, the Mashpee Planning <br /> Board uses a number equal to 150% of the agreed upon construction cost. <br /> Examples of a covenant document and the accepted forms of security can be <br /> obtained from the Town of Mashpee Planning Department. If the project is secured with <br /> a covenant, reference to the covenant should be noted on the recorded plan. <br /> It is recommended that a time limit for construction be set (two years is typical) if <br /> the project is secured by a cash deposit or performance bond with the Town of <br /> Mashpee. This time limit is adjustable along with the secured amount as construction <br /> progresses. <br /> Conclusion <br /> The plan shows a residential subdivision that has been designed in general <br /> conformance with the Mashpee Planning Board Rules and Regulations with some minor <br /> adjustments. <br /> Storm water designs include components that are generally accepted as part of <br /> Best Management Practices in the Massachusetts Department of Environmental <br /> Protection Storm Water Policy. Some adjustment could be done without compromising <br /> the intent of the Policy. <br /> I am available to meet with the Board of Appeals on Wednesday, July 30, 2003 <br /> and will prepared to answer any questions may have. <br /> Very truly yours, <br /> OF Mgss�c P00 Ur E sc <br /> 9 <br /> CHARLES CHARLES <br /> g L % LINCOLN mi <br /> •�,� ROWLEY w v ROWLEY y <br /> Charles L. Rowley, PE, RLS A Noel �Q �F o. znor�o <br /> f0.^ G/STEL OQ <br /> Cc David C. Thulin, PE, PLS SSS/ONAL ENG\ NO SURA"' <br /> 10 :C Nd Cl?des co <br /> �� <br /> M&37.9JO�ly-41o1 <br />