Laserfiche WebLink
Meetinghouse Hill Plan Review <br /> Page three <br /> A small area in the southwesterly comer of the site appears to be a low point <br /> where water could collect after a significant rainfall. There is also a natural drainage <br /> swale southerly of the property line that discharges storm water runoff onto the site <br /> before it finds its way toward Meetinghouse Road. <br /> This latter feature is a point of accumulation for runoff that originates on the <br /> southerly side of the access road that leads to the new water tank. A pipe culvert <br /> intercepts storm water from an old road cut and discharges it onto the north side of the <br /> access road where it collects with runoff from the surrounding ground. This runoff <br /> eventually finds its way toward the low point at the southerly side of Lot 1. <br /> The drainage calculations were reviewed with several items noted as being <br /> critical to the design for storm water control. <br /> 1. Soil types in the project area, <br /> 2. Depth of high ground water, <br /> 3. Amount of pervious and impervious cover, <br /> 4. Times of concentration allotted to the overland flow of surface runoff. <br /> Soil Types <br /> Soils are noted as Carver deep sands and Enfield loamy sand. The Carver soils <br /> are highly permeable and are located mostly within that portion of the site that has been <br /> previously disturbed and excavated to form an abandoned sand pit. The Enfield soils <br /> are much less permeable and occur on the higher slopes and contribute to runoff mostly <br /> in the northeasterly comer of the site. <br /> Ponding Area <br /> The entire ponding area of the existing site has been assumed to be impervious <br /> (flooded or frozen) for pre-development conditions. This may be a very conservative <br /> approach in determining the actual need for flood storage but serves the purpose of <br /> establishing the capability of the ponding area to contain the 100-year runoff without <br /> exiting to the discharge point near Meetinghouse Road. <br /> The importance of this is reflected in the design of the subdivision drainage <br /> system. The essential part of the design is to insure that peak runoff from the site after <br /> development is no greater than runoff calculated for pre-construction conditions. Most <br /> runoff appears to be contained within the site due to the volume of the available ponding <br /> area. Therefore post construction must also be able to contain runoff to the same extent <br /> so as not to adversely increase off site runoff conditions. <br /> Design Methods Used <br /> The proposed methods of controlling water quality and quantity are shown on <br /> Sheets 3, 4 and 5 of the plans. Water quality control is achieved through the use of <br /> deep sump catch basins, a water quality sediment trap located in the drainage line east <br /> of the house on Lot 4, and a forebay basin that is the receiving point for most storm <br /> water generated from the proposed roadway. The sediment trap is intended to receive <br /> low flows and to contain finer sediments that would otherwise reach the forebay. A by- <br /> pass line allows larger flows to go directly to the forebay. The system is not adversely <br /> affected by the by-pass line. <br /> Water quantity is controlled by the use of storage in the forebay, a detention area <br /> and a controlled outlet and leaching pit that is located at the westerly edge of the <br /> detention area. No elevation is given for the bottom of this leaching pit. It is assumed to <br /> be above the high ground water elevation of 93.6 but should be confirmed by the design <br /> engineer. <br /> Runoff that reaches the site from off-site sources is unaffected by the proposed <br /> design. The design appears to take this added source into consideration. The point of <br />