My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/09/2002 ZONING BOARD OF APPEALS Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2002
>
01/09/2002 ZONING BOARD OF APPEALS Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 11:40:51 AM
Creation date
2/14/2022 2:37:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`r Mashpee Zoning J. Robert Casey, Trustee SP-02-2 2 <br /> Board of Appeals <br /> SPECIAL PERMIT CRITERIA <br /> Section 174-2519 states that the Board must find that the structure will not <br /> unduly interfere with the free passage of travel by water or land or cause or contribute <br /> to the substantial disruption or degradation of the marine or coastal environment. <br /> E : GENERAL FINDINGS <br /> 1. that the subject property is located at 5 Mute Swan Circle and consists of <br /> K <br /> 36,340 square feet of land fronting on Shoestring Bay. <br /> ; SPECIFIC FINDINGS <br /> The Board determined that: <br /> �r <br /> 1. the proposed dock will be an accessory to an existing dwelling and is a <br /> permissible use upon the grant of a Special Permit. <br /> 2. the Petitioner met the criteria for granting of a Variance of 22 feet to exceed <br /> the allowed 70-foot total length limit. <br /> 3. the proposal has been reviewed by the Conservation Commission to address <br /> impacts on the coastal environment. <br /> 4. the use is in harmony with the general purpose and intent of the By-laws. <br /> 5. the owner has rights to maintenance in perpetuity. <br /> 6. filing with the State DEP Wetlands Program shall be considered execution of <br /> the Special Permit. <br /> In view of the foregoing, the Mashpee Zoning Board of Appeals found that the <br /> Petitioner met the criteria necessary for the granting of a Special Permit. Upon motion <br /> duly made and seconded, the Zoning Board of Appeals voted unanimously on January 9, <br /> 2002, to grant a Special Permit. The Special Permit is conditioned upon compliance with <br /> Sullivan Engineering plan entitled `Site Plan, Proposed Boardwalk, Pier, Ramp &Float <br /> F � <br /> at 5 Mute Swan Circle, Mashpee, Mass., Date: September 5, 2001, Revision Date: <br /> Q,y„r <br /> 12/28/01, Prepared for Edwin Sidman, c/o The Beacon Companies, 2 Oliver Street, <br /> Boston, MA 02109, Proj. # C-467'. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.