Laserfiche WebLink
• Board of Appeals Quashnet Valley - J.R.U. Realty Inc. 2. <br /> Further, based on the above facts, and noting the development <br /> of the lots and the 134 condominium required ongoing consultation <br /> between the Applicant and the Planning Board and the Building Inspector's <br /> office, and further noting that the Building Inspector did not maintain <br /> the schedule referred to in Paragraph 3, the Board finds that the <br /> Quashnet Valley project is not in default of the permit and that the <br /> Applicant is in substantial compliance with the terms thereof. <br /> BY: <br /> MASHPEE BOARD OF APPEALS <br /> IN FAVOR: <br /> Job F "el <br /> IN FAVOR: <br /> Micha A. Malunas <br /> IN FAVOR: <br /> dward M. Govon <br /> p (�C�L DMC <br /> NOV 3 1992 D <br />