My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/01/2022 DESIGN REVIEW COMMITTEE Minutes
>
02/01/2022 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2022 5:00:37 PM
Creation date
4/6/2022 9:11:04 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/01/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,T vi (Y- Arlashpee <br /> n <br /> Meeting Minutes <br /> Design Review Committee <br /> Tuesday, February 1, 2022 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Design Review Committee Members Present: Dave Morris, Jonathan <br /> Furbush, and Joe Callahan <br /> Dave called the meeting to order at 8:30 am. <br /> 8:30 am Business name: M3 Ventures, Inc d/b/a Triple M <br /> Project Address: 29/41 Echo Road <br /> Owner: Lianne Ankner <br /> Architect/Engineer: James Steedle <br /> Representative: Kevin O'Reilly, and Damon Smith <br /> Request: Cannabis Retail Store, The proposed building will <br /> be built out of wood (versus steel), will aesthetically look more <br /> in keeping with Cape Cod architecture, will reduce the <br /> footprint 3,700 sq. ft. to 3,600 sq. ft., and will be reduced to a <br /> single story building (versus 2-story building) 3,612 sq. ft. <br /> Lianne presented the Committee a revised building plan of the proposed <br /> retail cannabis store that will be adjacent to the existing medical cannabis <br /> building. The retail store has been open since June, and they realized that <br /> the space is oversized as well as on the initial design plan. The new <br /> proposed building will be a wooden Cape Cod style structure. <br /> Kevin provided the older plan for the committee to see the difference in the <br /> size and style. <br /> Joe asked if the business will be closed during construction. Lianne said <br /> that they do not have to close because there is a breezeway that will <br /> connect the existing building and the new building for business to continue. <br /> There are currently two temporary wings on the side of the existing building <br /> that will be removed once the new section is constructed. <br /> Jonathan confirmed the colors and texture of the siding for the building as <br /> submitted on the design plan. The existing building will be reconstructed to <br /> match the new building. <br /> Damon mentioned that the existing building has brick fagade on the bottom <br /> 4 ft. roughly with clapboard siding, and will be changed to match the new <br /> structure. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.