Laserfiche WebLink
homeowners in determining the amount and best location He recommends a negative <br /> determ ination. <br /> Assistant Agent read Board of Health and Building Department comments. <br /> Mr,Colombo asked how much mitigation planning is required. Agent recommended that <br /> mitigation should be enough to enhance the buffer zones to the river and pond. <br /> Mr.Smith said we could allow the homeowner to work with Conservation to develop a <br /> mitigation plan. <br /> Mr.Sweet motioned for a negative determination. <br /> Mr.Colombo seconded the motion. <br /> Vote: 5-0-0 <br /> Roll Call Vote: <br /> Mr.O'Neill; yes <br /> Mr.Sweet; yes <br /> Mr.Dalton; yes <br /> Mr.Colombo; yes <br /> Mr.Smith; yes <br /> In favor, 5; Opposed, 0; Abstentions, 0 <br /> 6:27 Brian M.& Nicole K.Clark, 138 Waterway. Proposed pier extension, ramp relocation NOI <br /> and float expansion. Representative: Cape &Islands Engineering, Inc. <br /> Mr.Sweet asked if there was a navigation review? <br /> Assistant Agent said there was and read Harbormaster comments. <br /> Mr.Sweet motioned to continue per the applicant's request to 4/14/22 at 6:09pm. <br /> Mr.Dalton seconded the motion. <br /> Vote: 5-0-0 <br /> Roll Call Vote: <br /> Mr.O'Neill; yes <br /> Mr.Sweet; yes <br /> Mr. Dalton; yes <br /> Mr.Colombo; yes <br /> Mr.Smith; yes <br /> In favor, 5; Opposed, 0; Abstentions, 0 <br /> 6:30 David M.&Ana S. Ferris, 36 Seconsett Point Road. Request for Certificate of COC <br /> Compliance 043-2608. Representative: Cape & Islands Engineering, Inc. <br /> NOI: Notice of Intent <br /> RDA: Request for Determination of Applicability <br /> COC: Certificate of Compliance <br /> PRE/POST-HEARING AGENDA: <br /> • Discussion: Pledge of Allegiance before each meeting <br />