My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/09/2022 SEWER COMMISSION Minutes
>
06/09/2022 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 4:01:53 PM
Creation date
6/16/2022 3:58:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/09/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />MASHPEE BOARD OF SEWER COMMISSIONERS <br />THURSDAY JUNE 9, 2022, 2:00 p.m. <br />WAQUOIT MEETING ROOM <br />MASHPEE TOWN HALL <br />16 GREAT NECK ROAD NORTH <br />MASHPEE, MA 02649 <br />*In-person, Televised meeting* <br /> <br /> <br />Present: Meredith Harris, Vice-Chairman, Joe Lyons, Al Towle <br />Other attendees: Town Manager, Rodney Collins <br /> Assistant Town Manager, Wayne Taylor <br /> Marc Drainville of GHD <br /> Chad Smith <br /> Phyllis Sprout <br />Absent: <br /> <br />2:00pm – Convene Meeting Vice-Chairman, Joe Lyons called the meeting to order at 2:00pm in <br />open session. <br /> <br />MINUTES <br />Mr. Towle made a motion to approve the minutes of the June 2, 2022 Sewer Commission <br />meeting. <br />Meredith Harris seconded the motion. <br />The motion was passed by unanimous consent. <br /> <br />NEW BUSINESS <br /> <br />1. Review the Bidding Process for the Wastewater Project. <br /> <br />Mr. Collins gave an overview of the responsibilities of the project. He stated that GHD would be <br />responsible for the engineering and construction of the facility/plant. <br />Environmental Partners would be responsible for the collection system itself. <br />Weston and Sampson would act as the Owner’s Project Manager (OPM). <br /> <br />Marc Drainville of GHD explained that EP would be responsible for the mechanical components <br />of the pumping stations and that GHD would be responsible for the control aspects of the <br />pumping stations. <br /> <br /> <br /> <br />1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.