Laserfiche WebLink
Mr. Grassetti was present to bring -the Board up to date and <br /> to ask for a formal extension of the 15 month per".od. He <br /> now has approval for the waste. nateAr treatment plant �hz;n.h <br /> was received on May 24th, 1990 . <br /> September was the first flow into interim syste:�:I. <br /> They would like an outside date fo+ the completion of the <br /> plant for their extension. <br /> The Board of Health has reviewed the permit and approved it <br /> and the applicant will.. begin construction of the plant71 <br /> 3 ' <br /> immediately and expect it to be up and running in 8 to 1� i <br /> months . <br /> Pat doesn' t see building this plant at this time. with such <br /> low flows, while their might be other opt-ions in the future. <br /> Mr. Grassetti stated that they have to build it now, they <br /> have explored all the other options and held on as long as <br /> they can. <br /> Judy made a motion to grant a 12 month extension and ' <br /> determine that this is not a significant change to the <br /> Special Permit but would like to notify the Dotuit Water <br /> District of the extension. Louisa seconded the :notion. <br /> Wayne abstained. All other Board members were in favor. .. <br /> Applicant: windchime Point <br /> Location; Great Neck Road South <br /> Request: Review of lawyer' s survey_ <br /> Attorney Pat Butler was present representing the applicant . <br /> He explained that representative f rom IFP were present to a:. <br /> clarify the groundwater contour r.^ap. <br /> Becky Smith was present and submitted a Zette form M. ' <br /> Powers of GZA who worked on the project in l9S 5. H-- s tat zs � <br /> that groundwater flow is more to the north than was <br /> previously stated in the 1985 report. ' <br /> IHP collected another round of water level me3sura:nents and <br /> developed a water table map which Closely parallels IBP 's <br /> 1989 water table map. <br /> Groundwater flow is to the Northeast- <br /> Ms . Smith explained that monitoring well B? is in an <br /> appropriate position as an upgrad�.ent mon�. is <br /> 160 feet upgradient of the leaching pits and the s�eil <br /> specifications are met. <br /> Tom suggested working with the Fields Point monitoring a: <br /> inf ormat ion for this project . I. <br /> Mr. Butler explained that the have provided Board with <br /> information regarding mace oinve.rte'cr a t a t s t+n: t -at :,7a3 <br /> requested. <br /> Louise did not have a chance to re•ri ew i t . <br /> P <br /> i <br />