Laserfiche WebLink
ip <br /> Minutes of the <br /> Meet- .1 of the <br /> PLANNING BOARD <br /> DATES June 27v 1973 <br /> FINES 8 s OO p 9me <br /> PRESENT: Earle Marsters Joseph Delaney <br /> Harold Collins William Lehmann <br /> Richardson Jonas <br /> John Um:*Lna had his subdiv:"Ls-on plan called "Seabrook village" <br /> approved and signed. by the Boards The Land court plan was <br /> also signed. Mr. Umina, took back the lineno <br /> Anthony Gargiulo resubmitted a Definitive play with the o � <br /> racoons requested by the Board on June 20. All 103 lots are <br /> over 1 o 00 square feete The name of the development was <br /> shortened to " ee woods" The Board req est ds <br /> le Showradius on easement on Great HayRoad. <br /> Show dotted. line for building setback line e <br /> r o Gargiulo has provided, an easement from the low spots to <br /> the open area.. He took back the linen and has pa3.d the filsm <br /> ing e e e <br /> A hearing was set for July 18, 1973- <br /> John Malonead ik Hill reported that 80 of the requested <br /> work has been done in Sections A and B of Santuit woods. Most <br /> of the work has been concentrated in section B ; the covenant <br /> on section A had been released previously* rs e Nemetz has <br /> authorized 5 more catch h rsinso The general plan of Santuit <br /> Woods was used to compare Mra s .ve ' s list of April 10 with <br /> his letter of June 1* An extension was made until July 18 <br /> when M o Saxery and Town Councel will be equest d to appear. <br /> The Board requested, plans, rofaLl s, covenants and o res ond-M <br /> ance regarding sections AandB be removed from the files for <br /> the July meeting* <br /> Don Priestly wants to revise a profile plan. He was told to <br /> get the approval of Mr. Savery and submit the revised plan to <br /> the Beard. <br /> Keith hteins, representing David Smith, submitted. a Prelim,, <br /> ins: plea for suhdIv* sio on the east side of South andom <br /> F. wih Road, conta*n*ng 31 lots on 18 acres <br /> The Board, requested s <br /> l '' <br /> 1. Temporary turn around between <br />