My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/1975 PLANNING BOARD Minutes
>
04/02/1975 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 5:04:16 PM
Creation date
1/4/2023 10:43:17 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
04/02/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of the <br /> Meeting of the <br /> PLANNING BOARD <br /> DATE: April 2. 1975 <br /> TI VIE 1 8100 <br /> PRESENTt Richardson Jonas Peter Sloane <br /> Thomas Bourgeol' s Phil Helene s Cons. Eng. <br /> hearing was held on the subdivision owned by Manuel <br /> Sherman and Jerome Weinberger. Joslin Whitney was pre <br /> sent with Mro Sherma,ne <br /> The plan conformed with the Board' s requests of arch 5 <br /> The name of the road has been changed to "Turtleback Rd." <br /> Mai a Whitneydid net submit prints, only the linen, with <br /> the name a h n e <br /> i <br /> The leaching basins are sunk 11 Feet and. in r* Holmes <br /> inion, theywill let leach. Theywill�serve to dlrect��., <br /> the water into the pipes shown on the plan which drain <br /> into the low lying begs h ehind' .the subdivisiont Upon Mr. <br /> Holmes' suggestion, the pipes in the hog will 'be e h'an e <br /> to the easterly <br /> The Board had requested the were. "no access" be written <br /> on the plan on these lets fronting on Route 28. Mrs Sher <br /> man refused* The Board will Write to Raymond. Kelleher of <br /> the Mess. Dept. of Public works requesting no permits be <br /> issued for cuts en. these lots which would provide d. eett,_11 <br /> access onto Route 28. <br /> James -and. Allen Walker, abutters., questioned the efficiency <br /> of the drainage system from Route 28 into their ho & The <br /> Flood their begs in the winter and consider flooding of the <br /> subdivision a possibility in a heavy rain. Mr. Jonas added <br /> if the drainage pipes back up, the leaching b-asins <br /> will not <br /> drains and, Mro Holmes said. they will net leacha Mro Shen <br /> an said, the problem of drainage and possible flooding of <br /> his property need net be of concern to the Board. or the <br /> Walkers* The De pt o of Natural Resources -has approved t h e <br /> drainage systems <br /> Then Mro Sherman informed. the Board the State is in the <br /> process of negotiating for 300 or 400 feet of his eubdi� <br /> vision along lots 1 �3 about 20 feet wide for strai htenm <br /> ing Route 8* Therefore, any drainage problems which may <br /> arise in the future would. he the respons3.bility of the <br /> State. <br />
The URL can be used to link to this page
Your browser does not support the video tag.