Laserfiche WebLink
Minutes of the <br /> Meet,in of t h e <br /> PLANNING BOARD <br /> DATE: August 7, 1974 <br /> TIME: 8200 P.M. <br /> PRESS T s Earle Marsters Ricba.rd.sonJonas <br /> Harold o i Phil Holmes, Con. En go <br /> Tom Bourgeois <br /> U. Realty suggested. ta,kitng out the road. between <br /> lots 25 & 26 (Quc-ashnet Valley) but the Board. would .- <br /> e only 'f theroad- was continued by lot 2. Mra <br /> mina_ decided. to leave it the way it 3. o Need, Town , <br /> Counsel' s approval of the covenant. <br /> r <br /> Ben Corin of Leisure Tech* informed_ the Board a new <br /> well site is being investigated wh1ch will be located <br /> on JaRsUo property. The Board, has o problem with an, <br /> alternate site, but would 1-5-k to see the ffinal selec- <br /> tion. <br /> At the Board' s next meeting, the Water Study Comma-ttee <br /> w Ill m a. h Planning d. d I C i t <br /> findinks. Mr. Corm will be referred. to them. <br /> The Board requested Mr. Holmes inspect h entrance to <br /> Sandalwood and. report to the Board how far setback the <br /> rocks are from the maan road_ <br /> Peter O re p representing * o o a was informed_ of the <br /> Boa d_* decision on Wood. Road in Sand.alwoodt either <br /> cut the full circle or cut the road through to Timber <br /> Landil.ng Roado He , said the Corporation will Probably <br /> want to tint out the circle. <br /> Regarding o Landing o cad.p the Bo a d informed M <br /> Ogren the reconstruction must me et ' the requirements <br /> set forth .in the 1974 Subdivision Rules and. egula-w <br /> tionse <br /> e Weller of the tarnstab . Survey Cons. requested the <br /> sIgned plans for Hurt Circle (L & L) . The plain was <br /> signed but he did not have copies of the Road. and. Open <br /> Space Covenants* Therefore# the Board held the plans. <br /> The Registry of Deeds was notified of our new m mherV <br /> The meeting adjourned at 10: 00o <br /> Deirdre Greelish <br />