Laserfiche WebLink
OLD BUSINESS <br /> 1. Plan and Delegate Responsibilities to Improve FAQ Visibility on the Mashpee Town Website and Post <br /> Notice Letters. <br /> Chair Smith stated that he is working on an outline with Mashpee TV to put together video content and the <br /> Commission should be able to generate web content from that. <br /> Catherine Castaneda said that the FAQ list is difficult for the general public to locate on the Mashpee website <br /> and suggested that a Sewer Project link be posted on the main page to access the FAQs and other official <br /> project information. She noted a few limitations to how the project's information is being titled, presented, <br /> and posted for easy, understandable public access. She suggested forming a small working group within the <br /> Sewer Commission to explore how vital project information can become more visible and useful via the <br /> Town's official website. <br /> Mr. Lyons suggested Catherine put her thoughts on forming the working group into writing so that the <br /> Commission can take a vote on it. <br /> NEW BUSINESS <br /> 1. Project Construction Update by Interim Town Engineer, Ray Jack. <br /> Mr. Jack gave a presentation on the Sewer Construction project showing that mains have been installed on <br /> Carleton all the way to the end of Asher's Path. The crew is currently working in Sea Oaks. <br /> 1100' of main has been installed on Simon Narrows up to Mashpee Neck Rd. <br /> Mr. Jack went on to state that there will be a detour on Route 28 throughout the month of April from the <br /> intersection of Orchard Rd. to High Sachem Rd. Chair Smith asked if there is a way to have the speed limit <br /> reduced on Quinaquisset Avenue due to the high volume of cars that will be traveling on that road. Mr. Jack <br /> stated that it seems logical and he will look into it. <br /> As of January the WRRF (Contract 1) was 4.3% complete in expenditures. <br /> The Collection System North (Contract 2) was 19.6% complete and the Collection System South (Contract 3) <br /> was 3.6% complete. <br /> Mr. Jack gave an update on the Mass DEP SRF stating that the 0% interest was approved in January, 2023 <br /> ($54M). <br /> The Draft IUP released in December, 2022 and Mashpee is on the list ($12M). <br /> The Final IUP list has not been released by the State yet and Mr. Jack said he is looking into it. <br /> 2. Discussion of Sea Oaks Betterment Hearing. <br /> Chair Smith stated that the Hearing went well and the Betterment was approved. <br /> Mr. Lyons stated that the Property Manager at Sea Oaks said that the Town wasn't interested in working with <br /> Sea Oaks with regard to hooking up to Town water. Mr. Lyons said that a quote was drawn up for them by the <br /> Water District and because of the cost due to the contracts that are in place for Municipalities, the price will <br /> be very expensive. <br /> 2 <br />