Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> MARCH 8, 2023 <br /> Attorney Christopher Kirrane represented the applicant. Also present was Raul Lizardi-Rivera <br /> with Cape & Islands Engineering. He summarized the reasons he believes that this project should <br /> be approved by the Board; a code compliant building, a flood zone compliant lot, it was approved <br /> by the Conservation Commission with substantial restoration, storm water control that is currently <br /> non-existent on the lot, and the house is consistent with other houses in the neighborhood. There <br /> are no new non-conformities being created,there is sufficient parking, and in 2021 the Board made <br /> the determination that his project was not substantially more detrimental to the neighborhood. The <br /> actual square footage of the lot is 21,000 sq. ft. and the proposed lot coverage of the structure is <br /> 13% and well within the allowed percentage under the bylaw, and what the Board has approved in <br /> the past. Attorney Kirrane pointed out the definition of a"lot area" from the bylaws, "The area of <br /> a lot exclusive of any area in a public or private way open to public use, and any body of water." <br /> Mr. Furbush asked for the calculation of the lot size. Mr. Lizardi-Rivera said that the lot area is <br /> 1,250 sq. ft. He reviewed the site plan with the Board and explained the velocity zone area, and <br /> the area inside the triangle is 2,445 sq. ft., however if a flood zone touches the structure, the entire <br /> structure is considered to be in the flood zone. He explained that the 1,250 sq. ft. is roughly half <br /> of the area that is above the flood zone. The actual lot size is 21,000 sq. ft. because the right-of- <br /> way was eliminated from the 25,000 sq. ft. that was originally shown on the plan. Mr. Lizardi- <br /> Rivera uses CAD software to create the site plans. <br /> Attorney Kirrane confirmed that there is no elevator in this house, and also wanted to confirm the <br /> questions relating to the nullification of the bylaw, and the definition of a "story". The Building <br /> Commissioner addressed those items in his letter to Chairman Furbush. <br /> Mr.Reidy wanted to confirm the calculations of the lot area,and what is determined to be LSTCSF. <br /> Mr. Lizardi-Rivera said that would be Elevation 12 as shown on the plan. The land that is not <br /> within the wetlands is 1,250 sq. ft. The area including the structures is 1,749 sq. ft. Mr. Reidy <br /> wanted to confirm that that the existing structure is 1,749 is the existing, and the 2,974 is the <br /> proposed structure. <br /> Mr. Bonvie said that an easement or right-of-way that is 20 ft. or more should not be included in <br /> lot area, and in this case the wetlands as noted under the zoning bylaw. Mr. Bonvie wanted to <br /> confirm there are four existing non-conformities; minimum lot size, front yard setback, lot <br /> coverage, and set back to wetlands. <br /> Attorney Brian Wall represented the Andrew Family Trust at 226 Wading Place Road. Mr. Wall <br /> said he wanted to update his lot coverage as well. He said that the 2,445 ft. used in his calculation <br /> is based upon an engineer's calculation that he consulted with during the appeal, and he did not <br /> exclude the house "in the triangle". Mr. Wall said that the amount is now 1,205 ft. and increases <br /> the percentage that the proposed lot coverage is actually 243%. Mr. Wall suggested that the Board <br /> consider what the Engineer stated that most of the lot is in wetland and therefore the setback is out <br /> in the road. <br /> 2 <br />