My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/28/2023 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
>
03/28/2023 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 5:00:18 PM
Creation date
4/26/2023 10:44:09 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee - akehy Lake Management <br /> Committee <br /> March 28,2023 7:00 PM <br /> _. ........_...........:Mash lee Town Hall <br /> Meeting called by: Debi McManus <br /> Type of meeting: Monthly <br /> Secretary3 Barbara B. Nichols <br /> Attendees: Members: Barbara Nichols, Mike Rapacz, <br /> Paul Bibo <br /> Guests: Amy Peters, Shirley A. High Rock <br /> The minutes of the January 24, 2023 meeting were accepted as written after a motion by Paul Bibo and <br /> second by Mike Rapacz. <br /> Agenda topics <br /> [Agenda topic 1] Lake level/River outflow <br /> Discussion: Debi did the lake measurements on February 1" and 15th. There were 55.5 and 55.4 feet above <br /> sea level. There were 15 and 16 inches of water were flowing over the board closest to the lake. On the <br /> 1 st there were 12 inches of water in the stream and 11 inches on the 15th. <br /> Levels done on March 3rd and 17th were both 55.5 ft above sea level with 13.5 and 15 1/2 inches going <br /> over the board. There were 10 and 13 inches in the stream by the steps. The new white gauge by DPW <br /> decreased from 15 to 14 and back up to 15 during this time period . <br /> Levels were reported to Drew McManus in Conservation. Drew McManus emailed that AmeriCorps had <br /> assisted cleaning out brush from the Mashpee River on March 20th. Drew also emailed that DPW had <br /> done the spring clean out of the river in the cage area and removed 1 Y2 to 2 feet of sand from both sides of <br /> the cage. <br /> Conclusions: The water levels have increased with the increased precipitation but are still within <br /> acceptable range. <br /> [Agenda topic 2] Pond Study <br /> Discussion: Ed Eichner from TMDL Solutions and SMAST Coastal Systems will be updating the Select <br /> Board with a technical memo April 3`d. The sonde tubes will be deployed in mid-April and the testing will <br /> resume then. <br /> Conclusions. Ed Eichner will be speaking g on at the Select Board meeting April 3`d. Testing will resume <br /> p g p g <br /> in mid- April. <br />
The URL can be used to link to this page
Your browser does not support the video tag.