Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Owners, Samuel Ordonez and Cielo Ordonez <br /> 49 Clover Lane (Map 117 Parcel 328) <br /> Mashpee, MA 02649 <br /> SP-2023-02 <br /> No pre-existing, non-conforming single or two(2) family dwelling structures shall be torn down <br /> and rebuilt on any lot unless there is an issuance of a Special Permit from the Zoning Board of <br /> Appeals. Such a Special Permit may be granted only if the Zoning Board of Appeals finds that <br /> any changes, extensions, alterations or reconstruction of the pre-existing non-conformities are <br /> not substantially more detrimental than exists prior to removal of the existing structure and that <br /> there is adequate land area to provide sufficient parking. In no case shall new non-conformities <br /> be permitted without the issuance of a Variance. <br /> SPECIAL PERMIT CONDITIONS <br /> In view of the foregoing, the Board determined the Petitioner met the criteria for a Special Permit. <br /> Upon motion duly made and seconded at the Public Hearings on Wednesday, January 11, 2023 <br /> the Zoning Board of Appeals voted four to one(4-1) to issue a Special Permit to Owners, Samuel <br /> and Cielo Ordonez under §174-17.1 of the Zoning Bylaws to allow for a raze and replace of a pre- <br /> existing non-conforming single family dwelling on property located in an R-3 Zoning District,and <br /> Popponesset Overlay District, at 49 Clover Lane, Map 117 Parcel 328, Mashpee, MA with the <br /> following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Special Permit <br /> under Mass General Law 40A Section 9, <br /> 2. Sewage Disposal System- Prepared for: Samuel & Cielo Ordonez, 49 Clover Lane, Date: <br /> November 15, 2022, Drawn by: MMF, Scale: 1" = 10', Dwg. Name: 49 Clover Lane, Site <br /> Plan 11/15/2022, Prepared by: Flaherty & Stefani, Inc., Stamped and signed by: John R. <br /> Farren, Professional Land Surveyor, No.: 33590, and Mark M. Flaherty, Registered <br /> Professional Engineer,No. 33853. <br /> 3. House Plans — Ordonez Residence, 49 Clover Lane, Mashpee, MA, Plan Date: 11-15-22, <br /> Drawn by: SPB, Scale: 1/4" = 1', Prepared by: Designs by SPB, Signed and stamped by: <br /> John Martin, Structural Registered Professional Engineer, No.: 34288. Al: Right, Front, <br /> Rear, and Left Elevations, A2: Proposed First and Second Floor Plans, Sl: Proposed <br /> Foundation Plan, First Floor Framing Plan,and Section A, S2: Second Floor Framing Plan <br /> and Roof Framing Plan. <br /> 4. Conditioned on all Town Department comments read into the record. <br /> 5. The Board finds that the application as submitted will not be substantially more <br /> detrimental than what existed prior to removal of the existing structure. There is adequate <br /> land area to provide sufficient parking, and there are no new non-conformities being <br /> created. <br /> 3 <br />