My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/25/2023 ZONING BOARD OF APPEALS Decision
>
01/25/2023 ZONING BOARD OF APPEALS Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2023 10:20:05 AM
Creation date
5/15/2023 2:15:17 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Decision
Meeting Date
01/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> George C. Silvestro, Jr. and Mary L. Silvestro, Trustees <br /> 80 Waterway(Map 105 Parcel 214) <br /> Mashpee, MA 02649 <br /> SP-2023-05 <br /> The proposal consists of a new two-story, four bedroom structure. The site has a denitrification <br /> system that allows up to four bedrooms and meets the Board of Health requirements. The front <br /> yard setback is increasing slightly from 33.6 ft. to 31 ft. However, the westerly side setback will <br /> be improving from 11.8 ft.to 14.2 ft.The easterly side yard setback will be eliminated and become <br /> conforming at 16.4 ft. The setback from the nearest wetland will be improve from 16 ft. to 18 ft. <br /> The overall footprint hardscape on the lot is actually decreasing by 400 sq. ft. by removing the <br /> concrete patio. <br /> Attorney Kirrane said that the structure will be building code, and flood zone compliant. The <br /> project was approved by the Conservation Commission in 2022. Pursuant to Section 174-17.1 the <br /> Board has to make three findings: 1)No new conformities are being created, 2) There's sufficient <br /> parking onsite (there will be two parking spaces in the driveway), and 3)The Board must find that <br /> the proposed structure is not substantially more detrimental to the neighborhood than what <br /> currently exists. <br /> The Board had a discussion regarding the front setback shown on the proposed site plan that depicts <br /> 31 ft. to the proposed steps/walkway. The Board requested that the applicant provide a revised site <br /> plan prior to a building permit depicting the closest setbacks of the structure to the street of both <br /> pre-construction and post-construction, and that there is no increase on that setback. <br /> The Conservation Department comments dated January 24, 2023 were read into the record; "The <br /> Conservation Commission approved this project with conditions of compensatory plantings <br /> (mitigation) in the areas of existing gardens abutting the coastal bank in exchange for the raze and <br /> replace of the single family home and the temporary impacts thereof to the lot. Additional <br /> condition that any restored lawn areas must meet current conservation-friendly lawn standards as <br /> per Regulation 31 under Mashpee's Ch.172 wetland bylaw." <br /> The Board of Health comments dated January 19, 2023 were read into the record; "The septic <br /> design plan has been approved for 4 bedrooms. The floor plans depict 4 bedrooms rooms that meet <br /> the Board of Health bedroom definition. The raze and replacement of the dwelling will also require <br /> a rodent inspection prior to approval of the demo/building permit." <br /> GENERAL CRITERIA <br /> The subject property located at 80 Waterway is approximately 10,400 square feet. <br /> There were no abutters present. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.