Laserfiche WebLink
 Chop Chaque Bog Restoration: the pondin species will be dealt withSeveral invasive .for invasive species treatment applicationherbicide Estimate Fall 2023 timeline for Johns Pond <br /> and Santuit Pond Milfoil: hase. with Horsley Witten Group with 50% design pPublic scoping/stakeholder meeting to be scheduled Upper Quashnet Restoration: <br /> <br />Pre/Post Agenda Items <br /> <br /> <br />Mr. Kent provided the following updates: <br /> <br /> Red Brook Road Culvert: Funding and permitting is set. The Conservation Agents met <br />with the representatives for abutters on both sides of Redbrook (Town of Falmouth & <br />Mashpee) to see if there was interest in selling the association land on either side to the <br />town or to a partnership entity in the refuge so we can pursue wetland restoration. Mr. <br />Kent noted there was interest in selling the property on Falmouth side which would be <br />ideal for future restoration. Mr. Kent noted there were some design things that were <br />sought by the neighborhood, but that was not something that could not be <br />accommodated. <br /> <br /> <br /> <br /> DEP changed their stance on determination of <br />wetlands at this location and now agree that the big is an isolated wetland, which is what <br />we were hoping for. This means that there won’t be any added expense to the permitting <br />process, so we can move forward with the current plans for restoration. We will see a <br />Notice of Intent filed with the commission in late September. If approved, construction <br />may begin in the winter of 2024 as forecasted in the original timeline for this project. In <br />other words, we are on track for this project as originally intended <br /> <br /> Land Acquisition Sub-Committee: In response to Ms. Zollo, Mr. Kent clarified that the <br />Land Acquisition Subcommittee will be moving forward. Ms. Zollo emphasized the need <br />to start having those meetings and requested a future date. Ms. Zollo indicated that the <br />purpose of the Sub-Committee is to elevate items to the EOC. Mr. Colombo noted there <br />th <br />was an introduction/organizational EOC meeting July 26. Ms. Zollo envisions the <br />creation of the Sub-Committee with members from various representatives (Tribe, Land <br />Trust, et cetera) working on the numerous environmental issues. Mr. Colombo noted <br />th <br />that a meeting prior to EOC’s August 30 meeting would be ideal. Mr. Kent and Ms. <br />stth <br />Zollo will work on arranging a meeting sometime between the 21 and 25. Ms. Zollo <br />clarified that this would be a sub-committee of the Conservation Commission with <br />outside participants which Ms. Zollo will spearhead. Mr. Colombo will notify David <br />Weedon to add the EOC agenda. <br /> <br />Beginning to wrap up, Mr. Colombo informed the Commission he has an upcoming meeting <br />arranged by Sue Dangle regarding the septic test site at Joint Base Cape Cod. Ms. Copeland <br />expressed interest in going – Mr. Colombo will forward Ms. Dangles contact information to see <br />if that could be arranged. <br /> <br />There being no further topics, Mr. Cook made a motion to adjourn which was seconded by Ms. <br />Zollo which was unanimously approved. <br /> <br /> <br /> <br />