Laserfiche WebLink
16 Great Neck RoadNorth <br />wlashyee, wlassachusetts o2649 <br />Mashpee Planning Board <br />Minutes of Meeting <br />Wednesday, January 05, 2022 at 7:OOPM <br />Mashpee Town Hall - Waquoit Meeting Room <br />16 Great Neck Road North <br />Mashpee, Ma 02649 <br />APPROVED 01/19/2022 <br />Broadcast Live on Local Channel 18 <br />Call -in Conference Number: (508)-539-1400 x 8585 <br />Streamed Live on the Town of Mashpee website t .: // .mas p g / , in,in, l ®,1„81 <br />Present: Chairman John Fulone, Jack Phelan, Mary Waygan, Dennis Balzarini, Robert (Rob) Hansen <br />Also Present: Evan Lehrer — Town Planner, Catherine Laurent — Director of DPW, Ashley Lopes — <br />Finance Director for Mashpee Schools, Kevin Kirrane — Dunning, Kirrane, McNichols & Garner, Chad <br />Brubaker —Lisciotti Development, Casey Burch - Solli Engineering <br />Virtual Participation: Ed Pesce - Consulting Engineer <br />Absent: Joseph Callahan <br />CALL TO ORDER <br />Chairman Fulone called the meeting of the Planning Board to order at 7:OOP.M. The Pledge of <br />Allegiance was recited. Happy New Year everyone! <br />APPROVAL OF MINUTES — December 01, 2021 <br />There were no comments regarding the meeting minutes. <br />MOTION: <br />Mr. Balzarini makes a motion to approve the meeting minutes for December 01, 2021 as written. <br />Seconded by Ms. Waygan. All in favor. <br />PUBLIC DISCUSSION <br />Catherine Laurent and Ashley Lopes — They are here tonight to speak on behalf of the CPC <br />application Ms. Laurent submitted for the stadium renovation project. The total project cost is <br />$2.79million dollars. The track has exceeded its usable life. It was built over 25 years ago when the <br />school was built. Repair is not an option and reconstruction is necessary if the Town wants to maintain <br />the use of the track. The existing grass fields are overused and cannot support continued use at this <br />level. Maintenance requires significant time fertilizing, seeding, and watering. The grass fields are <br />unusable at times, particularly during rain. Synthetic turf will allow more play, especially with the lights <br />at the field. This will reduce play on other grass fields allowing reduction in fertilization and irrigation, <br />which will be completely eradicated on the stadium field. The CPA funds requested are primarily for <br />costs associated with replacement of the track. There are sufficient CPA funds available. Funding for <br />