My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/31/2005 BOARD OF SELECTMEN Minutes
>
01/31/2005 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 5:01:26 PM
Creation date
12/7/2023 12:02:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
01/31/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t t <br /> r , <br /> Board of Selectmen <br /> Minutes <br /> January 31, 20 <br /> APPOINTMENTS AND HEARINGS: <br /> DPW Director: <br /> Update on Coombs School Parking.Lot: <br /> Gregory Taylor, Director of Public Works gave a presentation to the . <br /> Board regarding the Coombs School Parking Lot reconstruction project. It <br /> was noted that the renovation project to improve traffic flow and main ain <br /> safety was approved by voters at the May Town Meeting as part of a $1.2 <br /> million dollar road bond project. <br /> The project n'll be presented to the School Committee this week. The <br /> bulk of the construction to substantial completion includes paving, <br /> drainage and lighting i anticipated to last five weeks beginning in the <br /> early summer. Bids in response to the request for proposal are due on <br /> March 7,, 2005. <br /> Road Bond Projects* <br /> Mr. Taylor presented a list of road areas slated for u' npro ernent this year <br /> and in fiscal year 2006 with road bond funds. The.following roach will <br /> receive surface treatment: Timberland give, Jackson Road, Quaker Run <br /> Road, Dove Lane, Jaynes Circle,Florence Avenue, Oval Lane, Pond Circle, <br /> robin Lane, Terry Avenue and Sunset Circle. <br /> Roads slated for reconstruction include; Lovell's Lane, Quashnet Road, <br /> Lowell Road, the DPW Parking Lot and the Transfer Station.. <br /> Route 11 and old Barnstable Traffic Si al: <br /> A study of the signal tinning with the actual traffic counts has established <br /> that the phasing and prograrn is appropriate with the traffic flow at the <br /> traffic signal and intersection of Route 151 and Old Barnstable Road. A <br /> minor ad ustment was made to change the gap time by one second. <br /> Route 2 8 and Orchard Road Traffic S iggal Update: <br /> Mr. Taylor recommended the Board of Selectmen remit communication to <br /> applicable legislative agencies to' re the State t move forward with the <br /> signalratron project at the Orchard Road and Route 28 intersection. At <br /> this time,the actual design is not in place. <br />
The URL can be used to link to this page
Your browser does not support the video tag.