Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A WRITTEN FINDING <br /> Owners, Cindy L. True and Michael Woodcock <br /> 53 James Circle (Map 71 Parcel 43) <br /> Mashpee, MA 02649 <br /> FINDING-2023-33 <br /> 4. Construction of the dwelling is contingent upon Board of Health final approval. <br /> 5. Construction of the dwelling will conform to current building code requirements. <br /> 6. There is adequate land area to provide sufficient parking and setbacks as may be required. <br /> WRITTEN FINDING CONDITIONS <br /> In view of the foregoing,the Board determined the Petitioner met the criteria for a Written Finding. <br /> Upon motion duly made and seconded at the Public Hearings on Wednesday, June 14, 2023, the <br /> Zoning Board of Appeals voted unanimously to issue a Written Finding to Owners, Cindy L. True <br /> and Michael Woodcock under §174-17 of the Zoning Bylaws to allow for a second story addition <br /> (same footprint), to an existing single-family, pre-existing non-conforming dwelling on property <br /> located in an R5 Zoning District, Map 71 Parcel 43, Mashpee, MA with the following conditions: <br /> 1. The Board has determined that the applicant meets all the conditions of a Written Finding <br /> under Mass General Law 40A Section 6. <br /> 2. Site Plan Showing Proposed Second Floor Addition: Project: Cindy L. True, Sheet No: <br /> SKC-1, Project No: C19317.00, Scale: V = 20', Date: 5/2/2023, Rev.: 5/3/23. Prepared <br /> by: Coastal Engineering Co. Signed and stamped by: John McElwee, Professional Land <br /> Surveyor,No: 33602. <br /> 3. Project Title: True Residence, 53 James Circle, Mashpee, MA. Phase: Issued for <br /> Construction, Project No: 350, Date: 5/1/2023, Drawn by: SEG, Prepared by: Longfellow <br /> Design Build,Drawing List: A0.0: Cover,A0.1: Abbreviations and Symbol Legend,A0.2: <br /> Demo Details, A1.0: Basement Floor Plan, Al.l: First Floor Plan, A1.2: Second Floor& <br /> Roof Plan, A2.1: Exterior Elevations, A2.2: Exterior Elevations, <br /> 4. Conditioned on a letter dated May 4, 2023 provided by Thomas V. Galligan, Professional <br /> Engineer,No: 39190 on the analysis of the Existing Foundation Wall. <br /> 5. Conditioned on all Town Department comments read into the record including but not <br /> limited to the Board of Health comments. <br /> 6. The Board finds that the proposed project is not substantially more detrimental than the <br /> pre-existing,non-conforming structure or use to the neighborhood. <br /> 4 <br />