Laserfiche WebLink
4 <br /> Mashpee Select Board <br /> Minutes <br /> January 22, 2024 <br /> APPOINTMENTS & HEARINGS <br /> Rqp4 ritA.Public Works Director Catherine Laurent: <br /> Stormwater MapWrqqRt U <br /> Catherine Laurent,Director of Public Works was in attendance with Garbielle Belfit of Tighe&Bond <br /> to review the Town's Asset Management Plan, a part of the EPA's Small MS4 Stormwater Program. The MS4 <br /> refers to Municipal Separate Storm Sewer System which includes all drainage within municipally owned areas. <br /> Stormwater is one of the fastest types of pollution in Massachusetts. <br /> Mashpee's Stormwater Progrw-n.(SWMP) consists of 5 Minimum Control Measures(MCMs). This includes <br /> public education and outreach, public involvement and participation, illicit discharge detection and elimination <br /> program, construction site stet' water runoff control, stet' water management in new development and <br /> redevelopment and good housekeeping and pollution prevention. The To in permit year 5 is required to <br /> address the MCMs each year. Ms. Belfit indicated the To of Mashoe has successfully addressed the permit <br /> year requirements, <br /> Ms. Belfit stated there is one additional area that needs to be addressed by the To of Mashpee. There is a <br /> need to address water quality; Total Maximum Daily Loads (TMDLs) and the number of water bodies impaired. <br /> The TMDL and impaired water body requirements and supplemental BMPs include; annual timed messages on <br /> nutrient pollution related topics, stet' water management Best Management Practices(BMPs)optimized for <br /> nitrogen and phosphorus removal, good housekeeping SOPSs for Town properties and street sweeping twice <br /> per year. All base are requirements have been met. <br /> A map of the TMDL water bodies was reviewed to depict the discharge outfalls, areas of impairment, and <br /> TMDL assignments. Ms. Belfit indicated there is need to specifically focus efforts on nutrient pollution,leaf <br /> litter, fertilizer and the management of house, waste distributed. <br /> Activities completed in pen-nit year 5 include; annual requirements, impaired waters/TMDL requirements and <br /> good housekeeping requirements, <br /> The BMP Retrofit Inventory Report, an activity completed in PY5 included phosphorus source ID requirements, <br /> pollutant load optimization for new and redevelopment and Ashumet& Santuit Pond impairment requirements. <br /> Five sites are selected for conceptual retrofit design. This includes the Attaquin Park deep sump catch basin, <br /> the Quashnet elementary bioretention basin,the To Archive sediment forebays,the DPW and the Mashpee <br /> Kids Klub, As the To moves forward to PY6 it is required the list of 5 sites selected for the conceptual <br /> retrofit design be ongoing. If one is implemented,another project from the inventory would be added to the list. <br /> It was noted that Town owned sites have been identified on As et Pond and within the San it Pond <br /> watershed. Additionally, all culverts have been inspected and analyzed for risk of failure and expense to <br /> develop the top retrofit locations. <br />