My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2024 SELECT BOARD Minutes
>
01/22/2024 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 11:59:57 AM
Creation date
2/14/2024 9:46:34 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
01/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 <br /> Mashpee Select Board <br /> Minutes <br /> January 22, 2024 <br /> APPOINTMENTS & HEARINGS <br /> Presentation and Update on,Status of the Construction of the Wastewater Treatment Facilityµ <br /> GHD Weston&&wwSampson(continued) <br /> The largest change order to the budget is the added process tanks. Realizing that Phase II that includes a <br /> portion of Phase I is ready for approval,the plant should be up and running before Phase II goes to bid. Phase <br /> II is intended to handle some equipment upgrades from Phase I. The equipment will be placed in areas to be <br /> constructed now. There should be no construction disruption with the added process tanks. <br /> There is concern with respect to the equipment that is being installed in Phase I as it relates to lack of use, cold <br /> weather conditions and warranty. It was requested the contractor obtain guidance from the manufacturer to <br /> ensure the validity of the warranty. Is it two years from delivery or one year from substantial completion? It <br /> was noted the equipment/pumps would not sit idle, and would be circulated periodically in water to maintain its <br /> function. <br /> There is disappointment the project is behind schedule. However,this is not a financial issue. Of the(3) <br /> contracts, Contract 02 and 03 are on schedule and should be completed on time. Contract 01 encountered the <br /> supply-chain delays due to major electrical gear. The contract time is approximately 60%expended. <br /> Discussion and oval of License Agreementwbetween theu,Town o f Mashpee and NSta Electric Coman <br /> d/b/a Eversource Energy at 380 Asher's Path UG#10341/010 020 Mashpee, MA WO#12451684_ Riser <br /> ._w. .,. _. <br /> Pole #283/1.5 yw: <br /> A License Agreement between the Town of Mashpee and NSTAR Electric Company d/b/a Eversource Energy <br /> for electric service facilities located at 380 Asher's Path,Mashpee was presented to the Select Board for <br /> approval. The License Agreement is required for the Wastewater Treatment Plant. <br /> It was noted that an article would be drafted for the May 2024 Town Meeting warrant for the permit. <br /> Motion made by Selectman Weeden to approve the License Agreement between the Town of Mashpee <br /> and NStar Electric Company d/b/a Eversource Energy at 380 Asher's Path—UG#10341/010-020, <br /> Mashpee,MA(WO#12451684—Riser Pole#283/1.5) as presented. <br /> Motion seconded by Selectman O'Hara. <br /> VOTE: 5-0. Unanimous. <br /> Roll Call Vote: <br /> Selectman Cotton,yes Selectman O'Hara,yes Selectman Sherman,yes <br /> Selectman Weeden, yes Selectman Wyman-Colombo, yes Opposed,none <br />
The URL can be used to link to this page
Your browser does not support the video tag.